Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />08/29/1997 Page 2 <br />Date Range :12/03/1900 - 08/08/1997 <br />CM Work Order Range :1001091070001 - UT0021-35- Pattern :7101096750313 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101096750313 (continued) <br />Vehicles: <br />ID <br />Description <br />Hours <br />------ <br />Cost <br />--------••- <br />------------ <br />V0010 <br />------------------------------ <br />'92 GMC S10 PU <br />6.00 <br />32.40 <br />V2112 <br />91 CHEV 1 TON <br />3.00 <br />15.93 <br />V2113 <br />91 CHEV 1-TON <br />15.00 <br />79.50 <br />V2225 <br />88 FORD SYD <br />3.00 <br />46.08 <br />V2663 <br />87 VACTOR <br />2.00 <br />95.40 <br />V3200 <br />80 CASE VIBROMAX W25 ROLLER <br />3.00 <br />59.16 <br />V3603 <br />86 CASE BACKHOE 780 <br />25.00 <br />990.00 <br />V6401 <br />80 CASE FLATBED TRAILER <br />3.00 <br />C.00 <br />VJ0002 <br />93 INTERNATIONAL 10 YD <br />25.00 <br />53'.00 <br />VJ0004 <br />195 CHEV 1-TON <br />10.00 <br />5'i.00 <br />VJ0017 <br />'96 FORD 5 YARD <br />3.00 <br />41.25 <br />Total Vehicle Cost: 1956.72 <br />Work Description: <br />------------------------+------------------------------------------------------- <br />REPAIR PLUGGED SIDE SEWER <br />REPLACED 6" PVC PROPERTY LINE TO MAIN -STATIONING ON MAIN IS INCORRECT. CHANGE <br />FROM 182 TO 185-MAIN 10' DEEP, SIDESEWER 8' AT PROPERTY LINE. <br />Total cost for work order 7101096750313: 5273.90 <br />