Laserfiche WebLink
- <br />CLOSED QI F10RK URDSRS REPORT <br />Total Utility Maintenanc09/25/1996nt System page 1 <br />D��te Range :O1/09/1989 - 09/09/1996 <br />CM Work Order Ranqe :1001091070001 - UT2600-02- Yattern .*101196750741 <br />it�:m Range :<Blank> - WW22020001 <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196750741 Title: REPAIR 3922 RUCKER <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS3095Z007 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 06/19/1996 <br />Overall Craft: Assigned to: <br />Issued: 06/13/1996 Issued by: WMP7 <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Readinq: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />UL <br />EO <br />DL <br />UL <br />EO <br />UI, <br />EO <br />DL <br />EO <br />UL <br />WST <br />GDJ <br />GMJ <br />HFE <br />HLF <br />ICAE <br />KNL <br />MJE <br />PJL <br />SDK <br />SSJ <br />WDT <br />liaterials : <br />ID <br />BOX000043547 <br />BOX000044747 <br />HOX000045147 <br />COUP38007347 <br />COUP38007447 <br />ELL038107947 <br />N/A <br />NIPP38134047 <br />PIPE38060947 <br />V?.LV38034348 <br />GOSS, DANNY JAMES <br />GREWING, MELVIN J. <br />HANNESERG, FRED E. <br />HUSBY, LARRY FRANK <br />KARELSEN, ADOLPHUS E. IV <br />KEEFE, NEIL L. <br />MCNIVEN, JOHN E. JR• <br />PREWITT, JEFFREY L. <br />STUART, Dl,RRELL K. <br />SMITH, STEVE J. <br />WI�LDEN, DAROLD T. <br />Description <br />Planned Hrs <br />------------------------- <br />BOX VALVE 18" Ci TOP&LID ONLY <br />SOX V?.LVE PLASTIC BOTTOM ONLY <br />BOX METER CONC W/STEEL LID <br />COUPLING COMP 2" MIP X CTS @ <br />COUPLING COMP 2" FIP X CTS @ <br />ELL 2" 9� DEG STREET BRASS ^ <br />CONCRETE (ASSOC) <br />NIPPLE 2" X 3" BRASS " <br />PIPE 2" POLY C.T.S. <br />VALVE GATE 2" SUPER HEAVY DUT7t <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />6.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />10.00 <br />10.00 <br />Total Labor Cost: <br />Date <br />06/19/1996 <br />06/19/1996 <br />06/19/1996 <br />06/19/1996 <br />06/19/1996 <br />06/19/1996 <br />06/28/1996 <br />06/19/1996 <br />06/19/1996 <br />06/19/1996 <br />p Used <br />-------1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />8 <br />1 <br />Total Material Cost: <br />Cost <br />76.38 <br />18.10 <br />8.50 <br />12.73 <br />18.10 <br />14.91 <br />18.53 <br />8.50 <br />18.10 <br />149.10 <br />199.20 <br />542 15 <br />Cost <br />16 88 <br />15.88 <br />130.61 <br />35.88 <br />22.03 <br />9.87 <br />55.84 <br />4.06 <br />8.32 <br />91.72 <br />391.09 <br />