My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3927 RUCKER AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
RUCKER AVE
>
3927
>
BASE FILE
>
3927 RUCKER AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 12:58:27 PM
Creation date
3/9/2017 12:13:57 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3927
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
473
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE SHEET <br />Receipt # <br />X Cost of Work Order 3,171.00 <br />Cost of Service Order <br />Contact Person "Steve" Kirtley Cole <br />Requested By Kirk Brooks <br />Property Owner (name) Everett Clinic <br />Charge Cost to (tine if different than owner) <br />Address 3901 Hoyt <br />Installation Location Three - 3900 Block <br />Installation type/description/size/etc. MY <br />City Everett <br />Public Works Departsesat <br />UdHtla Dfrlsloa <br />3200 Cedar Street <br />Everett, Washlagtoa 9=1 <br />(206) 239 MM <br />Date Paid <br />Work Order # <br />Service Order # <br />Telephone # 568-7919 <br />Date of Request 6.5-% <br />Zip 98201 <br />3900 Block Rucker, 1400 Block 39th <br />taps, install control valves and valve boxes for hydrants. <br />to do all other associated work. <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />❑ The following estimate is based upon the Street Division work group providing all labor, equipment, <br />materials and restoration to property. <br />Please notify the City of Everett Utilities Division 10 working d�sva in advancereaaired i■.►.tkdna at. n <br />allow for aebCdoellup and parts pmenrernexit <br />Whenever the estimated cost b not sufficient to cover the total expense for labor, material, equipment rental sad <br />administrative costs, the deficit shall be charted to the property for which such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the lotallades. <br />Itemized Cost Estimate: <br />Labor & Benefits $648.00 <br />Material 1,577.00 <br />Equipment Rental 708.00 <br />Surface Restoration /// <br />Sales Tax 238.00 <br />TOTAL S3,171.00 � / <br />cc: Bldg. Permit Center <br />Clair Olivers <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Paul McKee <br />oarry Crum <br />Prepared by: Gerry Crum Date Est. <br />Accepted by: PrcFatrd: Representing: <br />6-5-% <br />ESTIMATE GOOD FOR 6 MONTHC <br />CDSTAGND GC'_'OgLMWM ) <br /><<U.'��^.A L Cyr'^n�'�S <br />
The URL can be used to link to this page
Your browser does not support the video tag.