My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3927 RUCKER AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
RUCKER AVE
>
3927
>
BASE FILE
>
3927 RUCKER AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 12:58:27 PM
Creation date
3/9/2017 12:13:57 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3927
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
473
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6-11-1996 4:14PM FROM EVErETT CITY ATTNY 206 259 W93 <br />P. 2 <br />RISK ACCZPTAHM AM <br />wRROW0111 <br />JUN 1 8 1996 <br />......................................................... <br />CITY OF EVERETT <br />Public Works Dept. <br />RZLZABZ <br />Whereas, the Everett Clinic has made application with the City of <br />Everett for an expansion of its Main Campus; and <br />Whereas, the City of Everett issued a decision and a SEPA MDNS <br />authorizing the expansion; and <br />Whereas, the City's decision and MDNS are subject to a fourteen <br />(14) day appeal period; and <br />Whereas, the Everett Clinic provided the City with a petition <br />signed by concerned citizens who previously expressed some <br />opposition to the expansion acknowledging that they do not oppose <br />the Everett Clinic proceeding with the utility work related to <br />the project; and <br />Whereas, the Everett Clinic knowing and recognizing that there <br />are numerous uncertainties with proceeding with the utility work <br />related to the project at this time since the appeal period for <br />the Main Campus Expansion Project has not yet expired including, <br />but not limited to, that there could be an appeal filed that <br />would preclude and/or delay the issuance of permits for the <br />project, that the project could be denied, modified or <br />substantially delayed, and that the construction of the proposed <br />parking garage and outpatient services building may not be <br />allowed; and <br />Whereas, knowing and recognizing the risks attendant with <br />proceeding with the utility work at this time, the Everett C1_nic <br />desires to proceed at this time understanding that it bears the <br />risk of so doing and will not hold the City of Everett <br />responsible; <br />NOW, THEREFORE, THE EVERETT CLINIC AGREES AS FOLLOWS: <br />In consideration of the City of Everett authorizing the Everett <br />Clinic to proceed with the utility relocation work related to the <br />Main Campus Expansion Project at this time, and without which the <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.