Laserfiche WebLink
fl <br />Herb Boushey i ;:'" <br />Don Lind �¢ j, <br />� <br />4-26-79 <br />,�,, Sidewalk Repair Es?imate <br />wF55p�F The sidewalk on the east side of High Street near 41st Street next to tt,e <br />south driveway of the Arco Station was reported as damaged. The estimated <br />ccst to repair this sidewalk, an area of approximatety 5' x 7', is F• <br />�130.00. This cost covers labor, equipment charges and material�— <br />F. „ <br />_,_„ �.: <br />..,, � �, r'�1-., <br />� <br />� <br />AF'R 2 8 �ry <br />�� <br />