My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4102 RUCKER AVE SAFEWAY FUELING STATION 2016-01-01 MF Import
>
Address Records
>
RUCKER AVE
>
4102
>
SAFEWAY FUELING STATION
>
4102 RUCKER AVE SAFEWAY FUELING STATION 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 5:40:37 PM
Creation date
3/9/2017 12:33:18 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4102
Tenant Name
SAFEWAY FUELING STATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL ENGINEERING STUDY <br />Inform, Inc <br />May 9, 2002 <br />LIMITATIONS <br />E-8493-5 <br />Page 13 <br />Our recommendations and conclusions are based on the site materials observed, selective <br />laboratory testing and engi�eering analyses, the design information provided us, and our <br />experience and engineering judgment. The conclusions and recommendations are <br />professional opinions derived in a manner consistent with that level oi care and skill <br />ordinarily exercised by other members of the profession currently practicing under similar <br />conditions in this area. No warranty is expressed or implied. <br />The recommendations submitted in this report are based on the data obtained from the <br />borings within the vicinity of proposed fueling station. So�l and groundwater conditions <br />between the borings may vary from those encountered. The nature and extent of <br />variations between our exploratory locations may not become evident until construction. <br />II variatlons do appear, ECI should be requested to reevaluate the recomme�dations of <br />this report and to modily or verify them in writing prior to proceeding with the <br />Construction. <br />Addkional Sorvicei <br />As the peotuchn�cal enpineer of record, ECI shoulA be retained to perform a general <br />review of thc final desipn to vari(Y that the earthwork and foundation recommendations <br />have been properly imerpreted and implemented in the desipn and the construction <br />spocilications. <br />ECI should also be retained to provide peotechnical services durinp construction. This is <br />to observe compHance with Uie desiqn concepts, specifications or recommendations and <br />to allow desipn chanpes in the event subsurlace conditions dif(er irom those anticipated <br />prior to the start of construction. We do not accept responsibility tor the pertormance of <br />thn_ loundation or e�nhwork unless we aro reteined to raview tho construction drawings <br /><7nd speclficaUons, ��nd to nrovide construction observation and testing services. <br />LB�ih Cnn�ullnnlY. Inr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.