My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4128 RUCKER AVE SAFEWAY FUEL STATION 2016-01-01 MF Import
>
Address Records
>
RUCKER AVE
>
4128
>
SAFEWAY FUEL STATION
>
4128 RUCKER AVE SAFEWAY FUEL STATION 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2018 8:20:17 AM
Creation date
3/9/2017 12:46:01 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4128
Tenant Name
SAFEWAY FUEL STATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. The Snohomish County PUD currently has sufficient capacity to serve the <br />proposed development. For further information about the electrical service <br />requirements for this project, please call Kurt Martin of the DistricYs Customer <br />Engineering Office, Evereri at 258-8291. <br />13. Verizon Northwest has facilities near this location. However, any building <br />entrances must be coordinated at least 60 days in advance. The cost of any <br />relocation of Verizo� facilities that is required to construct the new apartments will <br />be at the total expense of the developer. Any relocation will take 60 to 120 days. <br />Please contact Mike Hupf, Engineer at (425) 356-4052 or Mike Bly, Engineer at <br />(425) 356-4034 if you have any questions regarding this building entrance. <br />14. Verizon Northwest will provide service to the site. However, new telephone cable <br />construction will be required in conjunction with the site development. Verizon's <br />engineering will begin when they are notified of your construction schedules and <br />telephone requirements. <br />15. It will be the developer's responsibility to provide a suitable combination of conduit <br />and trenching and/or riser conduit to accommodate Verizon's network <br />communications cable within the complex. Provided that an acceptable <br />combination of conduit and/or trenching is incorporated intc the project to <br />accommodate Verizon's entrance cable, there will be no costs to the developer for <br />Verizon's cable. <br />16. If a rearrangement of existing cables on premises or on the right-of-way is <br />necessary, appropriate charges will be estimated and Verizon's Guaranty of <br />Payment form will be forwarded to you for your signature. Prior to commencement <br />of Verizon's engineering for such rearrangement, a deposit will be required. To <br />insure timely telephone service, Verizon requests ninety (90) days lead time for <br />engineering, pro�urement, and installation of cable and/or Verizon's equipment. <br />Please contact Michael Hupf, Engineer, at (425) 356-4052 or Mike Bly, Engineer at <br />(425) 356-4034 should you require additional information. <br />S:1f Siddiq\W INW ORD\5[P�\Sepa02-038Safewa�nal.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.