Laserfiche WebLink
(some inspections, no final letter) <br />M-6 <br />Job Address: <br />Permit No: <br />Date of Permit: <br />A review of our inspection record file reveals that the last inspection made <br />at the subject address was on q-� All permits <br />expire by limitation and become null and void if the building or work <br />authorized by permit is suspended or terminated at any time after the work is <br />commenced for a period of 180 days. The City of Everett Building Code <br />requires final inspection for all permits issued, and it is the responsibility <br />of the permit holder to call for the necessary inspections. <br />If work is continuing, please call for inspection within the next seven days; <br />or if work has been unavoidably delayed, request from us in writing an <br />extension of your permit (permits may be extended once for an additional 180 <br />days from date of issue). If you do not contact us within seven days you may <br />assume your permit has expired. The Building Department is located on the <br />second floor, Service Center Building, 3200 Cedar Street; or call us at <br />259-8745. <br />Your cooperation in this matter will be appreciated. <br />Sincerely, <br />ALFRED R. THEAL, P.E., <br />Public Works Director/City Engineer <br />BY: L.N. Callahan <br />Building official <br />LNC/mm <br />1623H <br />0925H for primary merge document <br />