My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4231 RUCKER AVE 2018-01-02 MF Import
>
Address Records
>
RUCKER AVE
>
4231
>
4231 RUCKER AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2022 3:47:02 PM
Creation date
3/9/2017 1:00:12 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4231
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ee7T <br />r) Contractor: <br />Xwner: <br />Site Address: <br />ELECTRICAL <br />rJ Temp Service <br />❑ Groundwork <br />❑ SlabrConduit <br />❑ Rough In <br />❑ Service <br />[] Grounding <br />❑ Ceiling Grid <br />❑ Electrical Final <br />SITE WORK <br />❑ Fooling drains <br />hi Pool drams <br />r/Z 3/ A <br />INSPECTION REPORT <br />Dateh/-O Permit: &7n2-027 <br />,2c/YJO <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />MECHANICAL <br />❑ LIFER ground <br />❑ <br />Groundwork/Slab <br />❑ Footing <br />❑ <br />Rough in <br />❑ Foundation <br />❑ Ceiling Grid <br />❑ Structural Slab <br />❑ OK to insulate <br />❑ Framing <br />❑ Rooftop Units <br />❑ Insulation <br />❑ Mechanical Final <br />[]Drywall Nailing <br />❑ Shoat Nailing <br />❑ Rool Nailing <br />❑ Ceiling Grid <br />P.-dullding Final <br />OTHER OR CONSULTATION <br />1 PROVAL [, PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FORT C.0 ❑ CORRECTION REQUESTED ❑ <br />❑ OK FOR C.O [- VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION. <br />CAI ft?,t757-11881 FOR REINS PECTION- 24 hour notice required <br />-Z h S��C7 CDR/ ci s. S__fr� U_£�v_7��✓� <br />--- <br />PLUMBING <br />❑ Groundwork/Slab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate <br />❑ Water Service <br />❑ Medical Gas <br />❑ Plumbing Final <br />GAS PIPE <br />❑ Rough lwservico Hot We] er Tank <br />❑ Refrigeration ❑ Rough n <br />❑Gas Pipe Final HWT Float <br />?D- dsL,D_G�► _ <br />Inspector: P i r L Data: I pC. - O V <br />EiR 110M01 DATABM, INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.