Laserfiche WebLink
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that <br />If the said Principal shall construct, or have constructed, on or before the 31st <br />day of October , 19 86 , tt , Improvements herein described In accordance <br />with approved plans and in conformance with City standard specifications, to the <br />satisfaction of the City Engineer, and shall save the City harmless from any loss, <br />cost or damage by reason of its failure to complete said Improvements, then this <br />obligation shall be null and void; otherwise to remain in full force and effect. <br />In the event the City is r,�quired to institute litigation to obtain <br />performance pursuant to this bond, Principal and Surety agree to pay all reasonable <br />attorney's fees and costs which are Incurred by the City. <br />1985 <br />SIGNED, SEALED and DELIVERED this 31:.t. • day of October I <br />TIME OIL CO. <br />(PRINCIPAL) ccnne er, vice President <br />SM= INSURANCE OXIPANY OF AVEMCA <br />(SURETY) <br />r <br />A NEl N FACT)/ ' <br />