Laserfiche WebLink
INFORMATION FOR DEVELOPER: <br />1. Detailed drawings in accordance with 'tty Design and Construction <br />Standards shall be submitted to the Pliolic Works Department showing <br />site parking layout, landscaping, utilities, storm drainage, temporary <br />construction erosion control, and all required improvements in the <br />public right-of-way. Public Works Department approval of these <br />drawings la required prior to any permits being issued. All <br />improvementsi shall be completed, approved, and warranted before the <br />Occupancy permit is issued. <br />2. City streets and alleys are to kept clear of dirt and debris at all <br />times during construction. Dust suppression and street cleaning must <br />occur as d!.rected by the Public Works Inspector. <br />3. Performance guarantees are required for the curb, gutter and sidewalk. <br />4. Permits are required for destination of fill within the Everett City <br />limits. <br />1838F <br />