Laserfiche WebLink
PUBLIC WORKS PERMIT CUMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />} 5 Connect side sewer per City Standard #'s 601, 602, 604. � Gheck ex-s+� „9 ;,;de ss�a,- <br />�iF �o � reused conF:..,, ��{� P�bL� . Wor�el rnt(�ec�on _ <br />Connect all rooftop downspouts to .. ie side sewer. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />b{ W./Install erosion control measures as determined by the Public Works inspector, such as silt <br />� fence, straw bales, swales, or erosion blankets. <br />12 nstall erosion control measures per Ciry of Everett Standards for small parcels <br />1.'�. emove erosion cortrol measures upon completion of the project prior to final approval of the <br />7 permit. <br />g1�4 All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan li's 305A <br />& 306 on this proposal's frontage as directed by the Public Worlcs Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standerd q307. <br />17. Pave driveway from the front oroperty line out to the street paving. <br />18. Contact the _ Wr'er District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Stflndard Plan #402 with a gas trap per Standard Plan #410 is <br />r�quired for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21. A sprinkler sys;em is required for this buiiding in compliance with the requirements of NFDA <br />Standards 13D. <br />��' %�0 t'C-iaiv+v����9 �,,�nl(.s c�1-en�er -�han 3G,�-Fal(. cre 4��OW¢d <br />jn �h2 bv�ld�ny 5¢+hc,clt qr[4S� InLL�d��9 +he ${'{: Slde r <br />ya ds <br />PWCammems <br />�%a <br />