Laserfiche WebLink
� <br />3 <br />Puget Sound Power s <br />Special Property flse <br />Page -13- <br />Light Co. <br />Permit 16-8q <br />-�c✓ePi <br />��'`-y�'G SJp'S�.�T'„� <br />'<< /`�)��, � l� ``> `1 <br />� <br />DEC_ I� <br />Based upon the <br />testimony and preceding Lindings of facts and � <br />impressions o evidence submitted at �onclus' <br />is f the Everett Hearin the p blic hearin lons, the <br />it hereb � <br />Y ordered that g Examiner upon a site nd the <br />Permit to allow rebuildin the requested Special �iew, <br />phases over a five 9°f the Puget Power PCOAerty Use <br />construction op Year period be Substation in tWo <br />demolition a neW 1,600 9ranted, Phase I is <br />of a 2,800 5 square foot control house the <br />the construction of QUZLe foot control and the <br />westerly portion of a new 115 kV switchin�use. Phase II is <br />switchin the fenced area and t 9 facility on the <br />hereb 9 facility on the easterl he removal <br />Y ordered that the Y Portion. Further,thrt old <br />fO°t h19h chainlink Leq�ested variance is <br />south fence wit rbed w1Le tO allow a seven <br />Permitss =a e qranted subhectsubje�t property"'ishin the front and <br />J to the followin 9ranted, These <br />1• The S 9 conditions: <br />tWo pecial Propert}• Use Permit is only for the <br />is aPhases of the proposed dev�. p <br />ProPosed construction first <br />is not of �t� ment, phase III which <br />PP°PeCtYt1UsestbY C aPp1Y eCfor Pa� erty UseVPermith YThe <br />administrative Permit and additional Special <br />a of have a staff review <br />230 kV switch YyraprOval any construction of the new <br />Detailed drawings in accordance with <br />construction standards shall be submitted <br />Works Depactment �ity desi9n and <br />there are Showing landsca tO the Publ;c. <br />erosio anY�' Storm drainage, tFln9' utilities (if <br />publicn control, and all required m�orary construction <br />right-of-way, public imProvements <br />of these drawin works in the <br />lssued, �S is reSuired De zCt—ment_.aporoyal <br />All imp,ovements Prior to any permits being <br />and warranted befo.�e Shall be com <br />the Occupan� Pleted, approved, <br />Five i y Permit is issued. <br />5) feet of right-of-waY is to be dedicated on <br />Scenic �rive to the c;ty for street purposes. � <br />4• On-site detention is <br />on-site detention, y ei7uireod,CpR, in lieu of p=oviding <br />aliowed. Pz ment y Drainaoe Fund <br />340 is <br />':his requirement will be waived i� applicant will a <br />to provide the city with an easement for future <br />detention pond loc.�ted dow 9ree <br />P�o osed � nstream and to the LeO�°nal <br />p Pro'ect. east o� the <br />