My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1707 SCENIC DR SNO CO PUD 2018-01-02 MF Import
>
Address Records
>
SCENIC DR
>
1707
>
SNO CO PUD
>
1707 SCENIC DR SNO CO PUD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 2:57:05 PM
Creation date
3/9/2017 1:58:34 AM
Metadata
Fields
Template:
Address Document
Street Name
SCENIC DR
Street Number
1707
Tenant Name
SNO CO PUD
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />3 <br />Puget Sound Power s <br />Special Property flse <br />Page -13- <br />Light Co. <br />Permit 16-8q <br />-�c✓ePi <br />��'`-y�'G SJp'S�.�T'„� <br />'<< /`�)��, � l� ``> `1 <br />� <br />DEC_ I� <br />Based upon the <br />testimony and preceding Lindings of facts and � <br />impressions o evidence submitted at �onclus' <br />is f the Everett Hearin the p blic hearin lons, the <br />it hereb � <br />Y ordered that g Examiner upon a site nd the <br />Permit to allow rebuildin the requested Special �iew, <br />phases over a five 9°f the Puget Power PCOAerty Use <br />construction op Year period be Substation in tWo <br />demolition a neW 1,600 9ranted, Phase I is <br />of a 2,800 5 square foot control house the <br />the construction of QUZLe foot control and the <br />westerly portion of a new 115 kV switchin�use. Phase II is <br />switchin the fenced area and t 9 facility on the <br />hereb 9 facility on the easterl he removal <br />Y ordered that the Y Portion. Further,thrt old <br />fO°t h19h chainlink Leq�ested variance is <br />south fence wit rbed w1Le tO allow a seven <br />Permitss =a e qranted subhectsubje�t property"'ishin the front and <br />J to the followin 9ranted, These <br />1• The S 9 conditions: <br />tWo pecial Propert}• Use Permit is only for the <br />is aPhases of the proposed dev�. p <br />ProPosed construction first <br />is not of �t� ment, phase III which <br />PP°PeCtYt1UsestbY C aPp1Y eCfor Pa� erty UseVPermith YThe <br />administrative Permit and additional Special <br />a of have a staff review <br />230 kV switch YyraprOval any construction of the new <br />Detailed drawings in accordance with <br />construction standards shall be submitted <br />Works Depactment �ity desi9n and <br />there are Showing landsca tO the Publ;c. <br />erosio anY�' Storm drainage, tFln9' utilities (if <br />publicn control, and all required m�orary construction <br />right-of-way, public imProvements <br />of these drawin works in the <br />lssued, �S is reSuired De zCt—ment_.aporoyal <br />All imp,ovements Prior to any permits being <br />and warranted befo.�e Shall be com <br />the Occupan� Pleted, approved, <br />Five i y Permit is issued. <br />5) feet of right-of-waY is to be dedicated on <br />Scenic �rive to the c;ty for street purposes. � <br />4• On-site detention is <br />on-site detention, y ei7uireod,CpR, in lieu of p=oviding <br />aliowed. Pz ment y Drainaoe Fund <br />340 is <br />':his requirement will be waived i� applicant will a <br />to provide the city with an easement for future <br />detention pond loc.�ted dow 9ree <br />P�o osed � nstream and to the LeO�°nal <br />p Pro'ect. east o� the <br />
The URL can be used to link to this page
Your browser does not support the video tag.