Laserfiche WebLink
WAC 197-11-960 <br />SEPA ENVIRONMENTA� CHECKLIST <br />PUD N0. 1 OF SNOHOMISH COUNTY <br />15. Public Services <br />a. Would the project result in an increased need for <br />public services (for example: fire protection, <br />police protection, health care, schools, other)? <br />If so, generally describe. <br />No. <br />b. Proposed measures to ;educe or control direct <br />impacts on public services, if any. <br />N/A <br />16. Utilities <br />a. Circle <br />san <br />currently available at the site: <br />iral as water refuse service <br />tary sewer, septic system, other. <br />b. Describe the utilities that are proposed for the <br />project, the utility providing the service, and <br />the general construction activities on the site <br />or in the immediate vicinity which might be <br />needed. <br />No new services necessary except <br />' connection to City water line for <br />irrigation/sprinkler system. <br />C. SIGNATURE <br />FOR AGENCY <br />USE ONLY <br />The above answers are true and complete to the <br />best of my knowledge. The lead agency is <br />relying on them to make its decision. <br />Signature: T�`- f'I� ��"" , "'"""�`�t'Nu'�a-� <br />—T �' c�0�7�'12•L'6�`�, <br />Date: y a�" �� <br />