Laserfiche WebLink
t <br />CITY OF EVERETT �� <br />DEPARTMENT OF PUBUC WORKS �/�q _ <br />UTILITIES DIVISION "�� p, No.` <br />UTIL9TY WORK ORDER <br />Dete: � � � � � � � R� WATER <br />O SEWER <br />❑ STORM <br />� <br />�,, _�y <br />I I �� <br />(T SERVICE <br />❑ MAIN <br />❑ PUMP STATION <br />❑ TREATMENT <br />❑ RESEFiVOIR <br />❑ VALVE <br />� MAN HOLE <br />❑ CATCH BASIN <br />O DITCH <br />�;= 4714 <br />7� Zo "� <br />Acct No. L� l ���� <br />Complaint No. <br />� MAINTENANCE <br />❑ OPERATION <br />❑ HEPAIR <br />❑ CONSTRUCTION <br />Location: ��SCE.�%G c�— <br />W.O. Instructions: <br />/ 1�I�//- r �: �.i'l l( - l� /i! t -/. /n -77.pJ <br />I ESTIMATED <br />� Labor (hours) <br />� Material (cost) <br />iEquipment (cost) <br />ACTUAL <br />Labor (hours) . <br />Material (cost) • <br />Equipment (cost) : <br />;SCHEDULING REQUESTED <br />� USE CHARGE ACCOUNT NUMBER BELOW FOR LABOR TIME SLIPS. ITEMIZE <br />LABOR. EQUIPMENT, AND MATERIALS ON REVERSE SIDE. �,�i� �•., <br />I /, / Cost:$ <br />Completion (Date): r�'��—�� <br />Charge Account Number: <br />Address: <br />Invoice N <br />��as <br />Charge Cost To (Name): <br />nt:$ <br />