Laserfiche WebLink
s <br />err.. and lbs. Darrel rs+.od.aborg <br />the fill astarial. The flow of the subsarttaae <br />watre.sun the clay faawas the loosely <br />CantlaObsi fill that bes been placed am. the ' <br />ale�lYt surface to slide done the slope. 4his <br />araYen the property to alu p and undermines the <br />etrtiOt�I on the ptopetty. <br />7. me lop doe Mar am property adds to the <br />ptobIm b1 c9isatleg a plunge peal. rloh' leads <br />to scoriae of the underlying clay. WAS <br />lmcrabbes.the potastial for carte 811*0. <br />•• During theme parlods when the crook level is <br />high, the my IF ozodss the silty Bead arterial <br />lying over the clay layer. This erasion abuses <br />more rapid earth sliding. <br />b: analysis of the foots set forth in the repasts <br />peowlAas a clear Indication of the naenons for the <br />a�rapa to the psapsrtf. The findings of the sepert <br />sappeat the foilowiag aaaclusionan <br />1. The pmapstty is bssioally unstable, and the <br />genlaplo ad hydrogeologlo conditions of the <br />property haws resulted is earth sliding and <br />erosion. <br />2. over long periods of ties, loosely compacted <br />fill material ben been placed on the steps to <br />attain a level Lirface for building. Me <br />material used for backfilling is inadequate for <br />the underlying conditions of the property ad <br />bas not been properly compacted. Tba placement <br />of the mwitablo fill material without adequate <br />compaction hns increased the earth all". <br />1. Despite the raft that reports as early as lfai <br />warned of continued earth sliding becauw of the <br />fill material and the underlying conditions of <br />the property, you have failed to take adequate <br />measures to protect the property against <br />sliding. <br />