Laserfiche WebLink
y,,,,,,, <br />SENMU CONSTRUCTION SEQUENCE <br />1. Steel piles ate placed in drilled holes and set in comae, a footing at placed <br />with properly sized vertical steel columns. <br />2.DURM AGG units are sucked inae r eutally between steel beams. <br />3.DURAIAo G units ate filled with grout or concrete if required. <br />4.1'he finished wall is bvjtnlW or excavated to your engineer's requirements. <br />The archite=d surface is a smooth, tough plastic surface which craves b as <br />attractive "pW M- shape when filled with grout. Weep holes am loosed every foot <br />of length to permit free release of hydrwtatic ptastm. Cusmrn finishes and color <br />patoems are available upon regnest. <br />grow weight (each comvonent weight lets than 20 pounds). tugged durability, and <br />quick field innalladoa a0 offer the contractor and engineer a versatile and efficient <br />product :.t highly competitive 1,Aal cost. <br />U.S. Patent lending <br />Copyright 1992 Don Morin, Inc. <br />FOR PRODUCT AVAILABILITY <br />AND TECHNICAL INFORMATION <br />Dom Morin <br />DURALAGG <br />16600 SE 376th <br />Auburn, WA 98002 <br />(206)933-5691 <br />C. oNT9,4 err i 6' <br />Paul Weber <br />META ENGINEERING <br />750 N 145th St <br />Seattle, WA 98133 <br />(206) 368-W38 or (800) 788.9537 <br />FAX: (206) 361-5166 <br />