My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4524 SEAHURST AVE 2016-01-01 MF Import
>
Address Records
>
SEAHURST AVE
>
4524
>
4524 SEAHURST AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 12:15:25 PM
Creation date
3/9/2017 2:13:05 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
4524
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. Connect side sewer per City Standard #601. <br />5. Connect side sewer per City Standard #'s 601, 602, 604. <br />6. Connect all rooftop downspouts to the side sewer. <br />7. Connect rooftop downspouls to the drainage system provided for this lot. <br />8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br />Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br />more detaiis. <br />� The contractor must meet with the Public Worics Inspector to discuss patential drainage rc!�ting prior to <br />beginning the project. Call Rand Allen at 425-339-7403 Il Call Cliff Lindman at 425-339-7•?04. <br />10 Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankets. <br />� <br />15 <br />16. <br />Install erosion control measures per City of Everett Standards for small parcels <br />Remove erosion control me2sures upon completion of the project prior to final approval of the permit. <br />All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br />permitted site. No wasting of material is allov:ed on this building lot. <br />No dirt, mud, rocks or debris to be tracked onto roadway. <br />No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br />open for pedestrian travel. <br />Adjust water meter box 1" above sidewalk grade. <br />17. Remove and replace curb, gu'ter and sidewaik as per City of Everett Sts,. �d Plan #'s 305A & 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />18. <br />19. <br />20. <br />Install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway ftom the front property line out to the street paving. <br />Pave to existing paving in alley. <br />21. Contact the _ <br />sewer services. <br />Water Dislrict for connecting provisions for this building's water and <br />22. A catch basin as per City Standard Plan ii402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />23. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br />gravity flow across the public right-of-way. <br />2q. A sprinkier system is required for this buiiding in compliance with the requirements of NFPA Standards <br />13D. <br />pWCommenls 1 Revaed 618111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.