My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4624 SEAHURST AVE 2018-01-02 MF Import
>
Address Records
>
SEAHURST AVE
>
4624
>
4624 SEAHURST AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 9:31:50 AM
Creation date
3/9/2017 2:19:18 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
4624
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. Connect side sewer per City Standard #601 <br />�5. Connect side sewer per City Standard #'s 601, 602, 604. <br />6 Connect all rooftop downspouts to the side sewer. <br />Connect rooftop downspouts to the drainage system provided for this lot. <br />8 Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br />Manual 3.2 6 2 The approximate size trench is 3 5' wide, 2' deep and 25' long See attachment for <br />more details <br />%9\ The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />beginning the project Call Randy Allen at 425-339-7403 11 Call Cliff Lindman at 425-339-7404 <br />10 Install erosion control measures as determined by the Public Woiks inspector, such as silt fence, straw <br />6 <br />bales, swales, or erosion blankets <br />11 . Install erosion control measures per City of Everett Standards for small parcels <br />f <br />12 Remove erosion control measures upon completion of the project prior to final approval of the permit <br />C13 / All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted <br />site No wasting of material is allowed on this building lot. <br />/4 ii No dirt, mud, rocks or debris to be tracked onto roadway. <br />1 <br />15 No budding materials to be stacked on sidewalkhoadway and sidewalk/roadway to be kept clean and <br />open for pedestrian travel <br />16 Adjust water meter box V above sidewalk grade. <br />17 Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A 8 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i e. all unused driveways and any <br />broken or damaged area must be replaced) <br />18 Install a Type I concrete driveway per City of Everett Standard #307 <br />19 Pave driveway from the front property line out to the street paving <br />20 Pave to existing paving in alley <br />21 Contact the Water District for connecting provisions for this building's water and <br />sewer services <br />22 A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area <br />23, If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br />gravity Flow across the public right-of-way <br />;' Z4. A sprinkler system is required for this but' ;ing in compliance with the requirements of NFPA Standards <br />v- 13D <br />Your Public Works Ins, -„or is Cliff Lindman. Call him at 425-339-7404 for questions and inspections <br />PWComments l Revised 618111 01/1� <br />
The URL can be used to link to this page
Your browser does not support the video tag.