My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4624 SEAHURST AVE 2018-01-02 MF Import
>
Address Records
>
SEAHURST AVE
>
4624
>
4624 SEAHURST AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 9:31:50 AM
Creation date
3/9/2017 2:19:18 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
4624
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 7, 2011 <br />Mr. Paul Thompson/Kolbear. Inc. <br />L&A Job No. i 1 -00 1 <br />Page 8 <br />SiTE PREPARATION AND GENERAL GRADING <br />Vegetation within onstruction limits should be cleared and grubbed. Fill. topsoil, unsuitable <br />soil in the root zone and ik.osc weathered soils should be completely snipped within building <br />pads of the residences and in areas subject to traffic and structural load. The exposed soils <br />should be compacted to a non -yielding state, as required. With a vibratory compactor and proof - <br />rolled with a piece of heavy earthwork equipment. <br />EXCAVATION AND FILL SLOPES <br />Under no circumstance should excavation slopes be steeper than the limits specified by local. <br />state and federal safety regulations if workers have to perform construction work in excavated <br />areas. Unsupported temporary cuts greater than 4 feet in height should be no steeper than 1 H:1 V <br />in fill, topsoil and weathered soils of silty fine sand, and may be vertical in the underlying very - <br />dense, fresh till and dense advance outwash soils provided that the overall depth of excavation <br />does not exceed 12 feet. Otherwise, cuts in fresh till and advance outwash soils should be no <br />steeper that 3/411:1 V. Permanent cut banks should be no steeper than 2-1/4H:1 V in the fill and <br />topsoil, no steeper than 2HAV in weathered soil. and no steeper than 1-1/2I4:1V in fresh till and <br />advance auiw'a_sh soils. The soil units and the stability of cut slopes should be ohsmed and <br />verified by a geoteclmical engineer during excavation. <br />Permanent till embankments required to support structural load should be constructed with <br />compacted structural fill placed over proof -rolled, undisturbed, fresh, very -dense till and/or dense <br />advance outwash soil after the unsuitable surftcial soils are snipped. Fill embankments placed <br />over areas steeper than 15% grade should be structurally supported. Sloping ground steeper than <br />15% grade should be benched with vertical steps not exceeding 4 feet tall after stripping of the <br />surfucial unsuitable soils and prior to constructing permanent fill embankment. The slope of <br />LiU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.