My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4624 SEAHURST AVE 2018-01-02 MF Import
>
Address Records
>
SEAHURST AVE
>
4624
>
4624 SEAHURST AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 9:31:50 AM
Creation date
3/9/2017 2:19:18 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
4624
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 7, 2011 <br />Mr. Paul Thompson/Kolbear, Inc. <br />L&A lob No. 11-001 <br />Page 16 <br />paved driveways. Stormwater thus collected should be tightlined to discharge into a nearby <br />storm sewer or a suitable stormwater disposal facility system, such as rain gardens. <br />Building Footing Drains <br />A subdrain system should be installed, around the perimeter footings of each of the new <br />residences. The subdrains should consist of a 4-inch-minimum-diameter, perforated, rigid, drain <br />pipes, laid a few inches below bottom of the perimeter footings of the buildings. The trenches <br />and the drain lines should have a sufficient gradient (0.5% minimum) to generate flow by gravity. <br />The drain lines should be %wrapped in non -woven filter fabric socks and completely enclosed in <br />clean washed gravel. The remaining trenches may be backfrlled with clean onsite soils. Water <br />collected by the perimeter footing subdrain systems should be tightlincd, separately from the roof <br />and surface stormwater dram lines, to discharge into a storm sewer or a suitable storrnwatcr <br />disposal facility, such as rain gardens. <br />Surface Drainage <br />Water should not be allowed to stand in any areas where footings, on -grade -slabs, or pavement is <br />to be constructed. Finish ground surfaces should be graded to direct surface runoff away from <br />the proposed residences. We recommend the finished ground be sloped at a gradient of 3 perct nt <br />minimum for a distance of at least 10 feet away from the buildings, except in the areas to be <br />paved. <br />Cleanouts <br />Sufficient number of cleanouts at strategic locations should be provided for underground drain <br />lines. The underground drain lines should be cleaned and maintained perrc,u;cally to prevent <br />clogging. <br />LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.