Laserfiche WebLink
coMaunr�ce <br />REOUIflED � <br />� INSPECTION <br />APPROVED <br />DIC <br />� <br />IMPORT...� ....�.. . _ .. ._ _ ._ . __ <br />ANT: Supply Intormatlon a�d check approprlate circles In the shaded boxes. <br />DlsreAard toplcs that don't describe your bullding or equlpment. DS2 [14S place chec�Cs In <br />the two 12ft columns. <br />Prescriptive exhaust ventllatlon exhaust requiremenis for each dwelling ur,it (VIAQ, S. 303): <br />,.. <br />�� . Mlnlmum(.25 w.g.) Mtr./model Fan Iabei(.1 <br />KRchenfan <br />Bathroom te <br />Bathroom fe <br />Bathroom fe <br />Laundry tan <br />t 00 CFM <br />� i: �`� 1 ;SJ �OCFM (W� <br />".. r' �� 50 C6M <br />�� .'��) 50CfM <br />, 50 CFM <br />50 CFM (1-2 bedrms) <br />80 CFM (3 bedrms) <br />100 CFM (4 bedrms) <br />� <br />G E�i!+`' �• : . , L'. — <br />:tE 5-4o aQ c <br />G E ;,gg OR r <br />u f ��,'i 0 i, .. <br />u F �?� O2. a <br />". G �.- �n ,� R = <br />Sone rating `# � �(r 1.3 il � <br />�'No <br />3 :: <br />I'0�' <br />9i�g <br />v ozterior to ihe furnace retum plenum and limii the ventSltion rate to bFlween.35 -.5 ACFI, <br />� Modiiications to the above integrated torcetl air system`may reyuire periorrnanco testing, in a <br />manner acceptable to'the buiiding'ofliciai, 10 demonsirate .35 -.5'. Air ChangesMour. . <br />'Five bedrooms or larget requires a desighed v+hole l�ouse fan system (Rate is 35 =.5 ACH) <br />O O°Q h1echanlcal ventilatlon fan ducts shall be � 4" and properry sized (VIAQ, Ta61e 3-3). <br />�� . <br />O C] Q Fresh atr shali be'ptovided ior each dwelling unit as tollows (VIAQ. S.302.s.1}; <br />Eoch bedroom; Tesled; scrcened; conlrollatiie, itirough-wail pgrt (a 4 5q, ln,) to the er�terior, <br />��ach recreatlon roam; One wall port as specified ior bedrooms. , <br />iher enclosed "habltabie" roomsi One waq porl as spociifed ior bedrooms. <br />verall living area: One vrall poii as speci(ied for bedrooms <br />O O QOR �Inteqrated forCetl air futnace which delivers ouiside,makeup airthrouqh ihe ducting systam <br />WSEC Framing phase requirements: <br />Inspected by Date <br />�' <br />� <br />Pb�e 6 <br />