Laserfiche WebLink
� 3 <br /> CL08ED CM NOR1C ORDERS REPORT <br /> Total Utility Maintenance Management System <br /> 05/12/1995 Page 1 <br /> G � ___________________________ _______ C CC SSCCCCC6 <br /> Date Range :O1/09/1989 - 05/02/1995 � <br /> CM Work Order Range :1001091070001 - 8801086100085Pattern :7401196751192 <br /> Item Range :<Blank> - WW22020001 Pattern : * <br /> Program ALL Function ALL Activity ALL <br /> CM W�P.K ORDER ID: 7401196751192 Title: CONVERT 5120 SEAHURST p `'� <br /> «DUPLICATE PRINTZNG OF THIS WORK ORDER» <br /> Item ID: WS3694X004 -- WATER SERVICE <br /> Location ID: '- <br /> Program 740 Function 119 Activity 6i5 <br /> Date Completed: 05/02/1995 <br /> overall Craft: <br /> Issued: 03/30/1995 Issued by: JSM Assigned to: <br /> Ovt of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actua] Hrs Cost <br /> ----- ------ ---'--'------------------ <br /> ----- ---`------- ---------- -------- <br /> UL MWE MOORE, WARREN E. 0. 00 2. 00 30.06 <br /> UL SSJ SMITH, STEVE J. 0. 00 1.00 15.03 <br /> WST WDT WALDEN, DAROLD T. 0. 00 3.00 _____60�?4 <br /> Total Labor Ccst: 105.33 <br /> Neteriala: <br /> ID Uescription Date # Used Cost <br /> -------- -------- --------- <br /> ADAP34000647 ADAPTER 3/4" FIP X INSTA-TITE@ OS/02/1995 4 28.00 <br /> 80X000065547 BOX METER CONC W/STEE?., LID O5/02/1995 1 29.64 <br /> COUP34004647 COUP7.IN� 3/4" ANG MET X FIP C� O5/02/1995 1 a.44 <br /> COUP34142847 COUPI ::NG 3/4" CTN X 3/4" MZP @ 05/02/1995 1 3. 30 <br /> ELIA34101447 ELL .'/4" 90 DEG BRASS ' 05j02/1995 2 2• 58 <br /> METE36089447 METER 5/8" X 3/4" NEPTUNE T-10 05/02/1995 1 27.90 <br /> PIPE34060647 PIPE 3/4" POLY I .P.S. 05/02/1995 2 0.48 <br /> VALV34008348 VALVE METER 3/4" TACK WING IP@ OS/02/1995 1 ______8_36 <br /> Total Material Cos�t: 103 .70 <br /> vehicles: <br /> Ip DeGcription Hours Cost <br /> � ---------------- ------ ---------- <br /> ------------ -------------- <br /> V2117 91 CHEV 1-TON HYD UNIT 3 . 00 _____16_80 <br /> � Total Vehicle Cost: 16.80 <br /> Work Desr_ription: <br /> ----------------------------------------------------------- <br /> METER'� 40304327 <br />