Laserfiche WebLink
P� IW�PECTION REPORT <br /> �� . <br /> � �.ddre�s —�S�/O _,�Pa-�`-8��_ <br /> Contracror—�-a� ��_ <br /> Oevner ��^'`� <br /> Date l��9s' — <br /> � APPROVAL , PARTIA� APPROVAL <br /> J VIOLATION �ORRECTION REQUESTED <br /> J Correctiors listed below MUST BE MADE before work can be approved. <br /> �Please contact inspecbr and arrange for appointment. <br /> �Was not able to perform inspeclion. <br /> �ALL 259-8810 FOR REINSPECTION-24 hour notice required <br /> A�*ERTIFICATE OF OCCUPANCY SHNLL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> � <br /> Insper,tor_— —Date���(�--- <br /> TYPE OF INSPECTION REOUESTED <br /> 7 Temp. Elect. J Framing J Gas Pipmg <br /> ��oohng J Drywall, Nailing J Consultation <br /> J Foundation J Shear Nailing � Groundwork <br /> J Duciwork J Grid J Struct. Slab <br /> J Wood Stove J Rough-in J Final <br /> J Masonry J Service J Insulation <br /> J Other — --- - <br /> J BLDG:Pmt.No.��-J MECH� PmL No._ ---- - -- <br /> J ELEC: Pmt. No.—----J FLBG� Pmi. No.— ----- <br />