Laserfiche WebLink
COMPLIANCE NWEC LOWRISE RESIL��NTIAL COMPLIANCE CHECK' .�ST ' <br /> IIEOUINED <br /> � Electrically heeted dwel!Ings, s 3 storles, Zone 1, Western Wasi. npton <br /> INBPECTION <br /> APPROVED IMPORTANT: Pleas� supply Intormatlon raqussted In the approprlat• <br /> shaded boxsa below. Dlsreperd boxsa that don't describe your buildl�p or <br /> •qulpment. Oo NOT plac� ch�cks In th� two laft columns. ' <br /> NWEC compllenc� pethway �elect�d on paps 2 of thls form: <br /> QChapter 6, Option I �Chapter 6, Option II []Chapter 6, Option III <br /> � ❑Chapter 6, Optlon IV � Chapter 4 Chapter 5 <br /> INSULATION PHASE <br /> � Wells(tnclud(ny rim joists) are insulated without compression to: <br /> -19 batt (Ch86, optfons I,III,IV) ❑R-24 (Ch il6,Optfon II) R-_(Ch#4 or 5) <br /> ❑ ❑ Vault�d celllnps are insulated without compression to: <br /> ❑ R38(Ch#8, all options) ❑�(Ch�i4 or 5) <br /> ❑ Skyllyht wall Intulatlan is properly installed and equivalent to standard wall R-values <br /> �Ceilinp fnsulation batts (n place behind skylight wells <br /> ❑ Vapor retarders are required in floors,walls, and some ceflings. Select one optfon tor each that you <br /> will incorporate fnto thisdwellfng: <br /> Floors: �subfloor plywood labeled EXPOSURE 1 ❑Poly plastic (2 4 Mil) ❑backed batts <br /> Walls: ❑ Poly plastic (a 4 Mil) ❑ backed batts <br /> Cefl!ngs: Not required where ventilation space averages >12"above insulation. <br /> face stapled backed batts ❑ Poly plastic(2 4 mil) <br /> p H�quired well Vapor retarders ara properly installed toward the warm side,tears are patched. <br /> HVAC maxlmum alzing requirement will is met with following system: W��� �'�"�'}��� <br /> Mfr. �odeV# Max. output KW <br /> Mexlmum allowed heating system capacity (150°/a of calculated design load) is �-3 KW <br /> Heat Pump efflciency will be met under the tollowing complfance path: <br /> ❑Ch#6, Option IV: air source heat pump: HSPF 2 6.8 <br /> ❑Ch �15 air source heat pump: HSPF 2 6.8, COP 2 2.7/2.0 <br /> ❑Ch#5 water�ource heat pump: COP2 3.0 <br /> p p Heatlnp system efflclency and alzing requiremenis are met as represemed in the box above. <br /> Coirectlnns: <br /> NWEC Insulatlon phase requ/rements: <br /> Approved by: <br /> Symbols used: _�qwh >prs�Nr than �lsu than t prsatsr than or�qud s/n� than or�quN <br /> �� <br /> rweee s•b�o <br /> Paqe 6 of 8 <br />