My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5620 SEAHURST AVE 2016-01-01 MF Import
>
Address Records
>
SEAHURST AVE
>
5620
>
5620 SEAHURST AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 4:18:02 AM
Creation date
3/9/2017 4:17:49 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
5620
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> I <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per Ciry Standard n601. <br /> � Connect side :�ewer per City Standard �'s 6U1, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> � Connect rooftop downspouts to the drainage systern provided for this lot. <br /> 9. Rooftop runoff mus: be discharged to a roof downspout infiltration system per�?ty of Everett <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br /> 10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector(i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 12. Install a Type I concrete driveway per City of Everett Standard s307. <br /> 13. Pave driveway from the front property line out to the street Faving. <br /> 14. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the pubiic right-of-way. <br /> 76. The contractor must meet with the Public Works Inspector to discuss �otential drainage <br /> routing prior to beginning the project. <br /> 17. A sprinkier system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> 1 g. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> (19�Install erosion control measures as determined by the Public Works inspector, such as silt <br /> �� fence, straw bales, swales, �r erosion blankets. <br /> � <br /> 2�Remove erosion control measures upon compietion of the project prior to final appruval of the <br /> permit. <br /> 21. Install erosion control measures per City of Everett Standards for small parcels. <br /> PNComments <br />
The URL can be used to link to this page
Your browser does not support the video tag.