Laserfiche WebLink
i �r <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works aparoved pian dated <br /> 5. Connect side sewer per Ciry Standard #601. <br /> � Connec' ide sewer per Ciry Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> �) Connect rooftop downspo�ts ro the drainage system provided for this lot. <br /> l..' <br /> 9. Rooftop runoff must be discharged to a roof downspout iniiltra!ion system p=r City of Everett <br /> Storm Manual 3-2.6.2. Width_, Depth_, Length _. <br /> 10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by che Public Works Inspector (i.e. all unused <br /> driveways and any broken or dzmaged area must be replaced). <br /> 12. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 13. Pave driveway from the front property line out to the street paving. <br /> 14. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 16. The contractor must meet with the Pubiic Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 17 A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> /18 All excavated material from foundation, sidewalk a��� driveways shall be hauled to an <br /> � approved, permitted site. No wasting of material is allowed on this building lot. <br /> 19 Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 2 . Remove erosion control measures upon completion of the project prior to final approvai of the <br /> permit. <br /> 21. Install erosion control measures per City of Everett Standards for small parcels. <br /> / <br /> PN'Comments <br />