My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6001 SEAHURST AVE 2016-01-01 MF Import
>
Address Records
>
SEAHURST AVE
>
6001
>
6001 SEAHURST AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 4:30:01 AM
Creation date
3/9/2017 4:29:42 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
6001
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Pnblfc Works Deput�e�t <br /> � I �O� Uelitie�Diwion,3200 Cedu Stnet <br /> � Everctt,Waihington 93201 <br /> COS'I'ESTIMATE SHEET (42�257-5800 <br /> Date Paid <br /> Receipt # <br /> X Cast of Work Order <br /> 2,984.00 Work Order # <br /> Cost of Service Order Service Order# <br /> Contact Person Paul Bustard Telephone # (360)651-2172 <br /> ���gy GordonWitcher <br /> Date of Request 12-3-97 <br /> propecty Owner(name) AMK Const,lnc. — <br /> C6uge Cost w(name if different than owner) <br /> Zi 98206 <br /> Address PO Box 12027 Ciry Everett P <br /> Installation Location 6001 Seahurst Ave <br /> Installation type/description/size/etc. 2"main extension. Sawcut Seahurst,expose 8"main,install saddle&2" <br /> contml valve. Place I50' (t)Z"pa�Y in contractor ditchline,backfill Seahunt to edge of row,restore area. <br /> � 'Ihe following estimate is based upon the Utilities Division providing all labor,equipment, materials, <br /> restoretion, and final hook-up. <br /> � The following estimate is based upon the Street Division work group providing all labor,equipment, <br /> materials and restoration to property. <br /> please noHfv tl�e Ci otEverett Utilitia Divi�ion 10 workin da s io advance of uired installatlon date to <br /> allo�v for schedulin¢and oarb orocuremeot <br /> W6enever the eetimated cost b not eufticient to cover the total expense for Irbor, material, equipmmt rcahl and <br /> �dminbtntive coso, the deficit shall be charged to the properry for which such iostallatian was made and t6e ow�ner <br /> t6ercof,and provided furtheq that any exass payment shalt be retumed ro the penon applying for the instatlatfoo. <br /> Ihmized Coat E�timate: <br /> ce: Bldg.Prnnit Center <br /> Clair Olivers <br /> Labor&Benefits 1,620.00 Tam Thetford <br /> 698.00 Kirk Brooks <br /> Material Gordon Wiaher <br /> 666.00 Dan Lowell <br /> Equipment Rental Stan Mitchell <br /> Surface Restoration ---- Paul McKee <br /> Getry Cntm <br /> TOTAL 52,984.00 * p��Locke <br /> •4 services to be contractor installed on separate S.O.'s. <br /> v <br /> Preparcd by: Gerry Cru Date Est. <br /> Accepted by: Preoared: Representing: <br /> I2-5-97 <br /> ESTiMATE GOOD FOR 6 MONTHS <br /> costncnn ecr.saaw�nro;) <br />
The URL can be used to link to this page
Your browser does not support the video tag.