Laserfiche WebLink
. d <br /> PUBLIG WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City S�andard #601. <br /> �� <br /> �/� Connect side sewer per City Standard #'s 601, 602, 604. <br /> Connect all rooftop downspouts to the side sewer. � <br /> '"� �n -il,c �,c�,lUy� oi n,ycficn <br /> � Co�n�c�rooftop downspouts to the dra na� system.pra�,�idedior this I�pt. G� <br /> ShafC � /»Gc�' f� -f�JC C��r�!/�.Si, , Ci��SvL7��;;�� f�� /'�'hlic 6,crf.S <br /> i�,(' C /' �Nr' d/ CJC/' <br /> 9. Rooftop �un��f r�i�i��bL`dische.�ed�o a roo1 downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. The approximate sizc: trench is 3.5'wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> rouling prior to beginning the project. <br /> 11. Install erosion control measures as delermined by the Public Wor4�s inspector, such as silt <br /> fence, straw bales, swales, or erosion biankets. <br /> 12. Install erosion control measures per City of Everett Slandards for smali parcels <br /> 13. Remove erosion conlrol measures upon completion of the project prior to final approval of the <br /> permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building Iot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on tliis proposai's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways ar�d any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> �'_.�. <br /> �, <br /> 17. j Pave driveway from the front property line out to the street paving. <br /> �. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per Cily Standard Plan �t02 with a gas trap per Standard Plan �410 is <br /> requited for the parking area. <br /> 20. I(a sewer purip system is to be installed, the pressure line must discharge into a private <br /> manhole, th�n gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required fcr this building in compliarce with the requirements of NFDA <br /> Standards 13D. <br /> ��Ft4Gsr.�menLs �� <br />