Laserfiche WebLink
1 <br /> , __ Stormwater Pollution Pievention Plan <br /> � 1.0 Introduction <br /> ' This Stormw atcr Pollution Prc��ention Plan (S�YI'PI') has becn preparcd as part of thc <br /> NPUES stormwarer permit requirements for the Sewa�• Lot 2a construction projcct in <br /> Everett, K%ashingtaz 77�c sirc is Iocated on nc�Southwesr.ridc of Ereretl, along Seu nv Blvd <br /> ' The exisNng site is n 6.12 acre undeveloped(ot. The proposed Jevelopment consists of d�e <br /> catstruc�ron q(a rrex� commercia!huildrng and n SO-slall parking lot. <br /> ' Conslruction acti��itics «ill includc excavation, grading, and construction of a]8,100 sf <br /> building and 33,700 sf parking lot. Thc purposc of this S�'VFPP is to dcscribc thc prnposcd <br /> construction acfivities and all temporan� and permanent erosion and sediment confrol <br /> ' (TESC) measures, pollution prevcntion measares, inspcctinn/monitoring acticitics, and <br /> rccordkcepin� that cr'ill be implemented durin� the proposcd construc6on prnjcct. The <br /> objecti�es nf thc S1VF'PP are to: <br /> ' 1. Implcment Bcst 1lanagement Practices (13�1I's) to pret�ent erosion <br /> and sedimcntation, and to idenNfy�, rcduce,climinatc or prevent <br /> ' storm��atcr contamination and watcr pollution from constructinn <br /> activih�. <br /> � 2. Prcccnt violations of surfacc watcr quality, ground watcr yualih�, or <br /> scdimcnt managcment standards. <br /> ' '. Prevent, durin�the construction phase, adverse��ater quality impacts <br /> including impacls on heneficial uses of the receicing�rater by <br /> controllin�; pcak flow ratcs and volumcs of stornn�ater runoff at Ihc <br /> ' Pcrmittcc's uutGills and downstream nf thc outf:�lls. <br /> 'This S�VPPI' was preparcd usin{; thc I?colo�v S�YI'1'P Tcmplalc do��nlo:�Jcd 1'rmn thc <br /> ' F;cnlo�� website on .hmc 13, 2007. This S�VI'Pi' ���as prepared based on the requirements <br /> set forth in lhc Cunstruction Stormwatcr Ccncral Pcrmit :+nd in thc Smrnnnalcr <br /> ' ;Hnnagemcn!�Ylanun/jnr li'es(crrr IVnslringron (S�17Mi17R'1V 2005). "Ilic rcport is dividcd into <br /> scven main sections �+�ith sevcral appcndices th:d include stomnvater related referenee materials. <br /> l hc topics ��resented in the exh of the main sections are: <br /> ' ■ Scction 1 — IN'rRODUCTION. "Iliis scction providcs a summary <br /> description of tl�c project, and the organi�ation of thc S WYPP documcnt. <br /> , ■ Section 2 — SI'fG UGSCRII'1�tON. This section provides a detailcd <br /> description of the existing site conditions, proposed construction acti��itics, <br /> ' vid calculated stomiwalcr Ilo�v ratcs for cxisting conditions and post- <br /> constniction condilions. <br /> , <br /> �--- <br /> , <br />