Laserfiche WebLink
� <br /> ' Stormwater Pollution Prevention Plan <br /> NPDES Construction Stonnwatcr pemiit(as provided in Appendix D), the Certified Erosion and <br /> ' Sediment ConVol I_ead will promptly initiate the implementalion of onc or morc of the <br /> altemati�'c BAII's listcd in Appendix C a(ter thc first sign [hat existing F3\1}'s are ineffective or <br /> ' failing. <br /> 3.1.3 Element #3—Control Flow Ratcs <br /> IIn u.�er to protect ilic propertics and �aatenea}�s do«mstrcam of the project site, stormwater <br /> discharges from the site �vil] be controlled. T'he specific 131�4Ps for flow control that shali bc uscd <br /> ' on this project include: <br /> • Sediment Trap (B1�1Y C2d0) <br /> , <br /> � :Vtemate Oo�v control BMYs aze includcd in Appendix C :�.s a quick reference tool for thc onsite <br /> inspector in thc event Uie II\-iP(s) listcd abo��c arc decmed ineffecti��e or inappropriate during <br /> 6 construction to satisfy thc requircments set forth in the Gencral NPDGS Pcrmit(Appcndi� D). <br /> To avoid potential crosion and scdimcnt control issues that may c�use a violation(s) ofthe <br /> NPDLS Construction Stonmvater pemiit(as provided in Appendix D), thc Ce:tificd Erosion and <br /> ' Sediment Control Lead ���ill prompUy initiate the implemcntation oCone or more of thc <br /> altcrnati��c 13LiPs listed in nppcndix C aRcr the �rst siE;n that esisting I3�-iPs are ineffective or <br /> failing. <br /> ' 7'he project site is located ���est of the Ct�scadc \,tountain Crest. r\s such,the project must <br /> com�ly with Liinirnum Requirement 7 Q:cology 2005). <br /> ' In general, dischargc rates of stonm��ater from lhe sitc �+�ill be controllcd nhere increases in <br /> impervious arca or soil compaclion during constniction ci�uld Ic�d to do��nstrcam crosion, or <br /> ' �vhcrc ncccss�trV lo ntect local agcnc}' slortn�ti�;�tcr dischar�c rcquircmcnis(c.g. disch:u�c lo <br /> comhincd scwcr s�'s�ems). <br /> ' 3.1,d I?Icmcnt Nd — Install ticdimenl Cnntrols <br /> All stonnwalcr runoff from dis�urbcd amas shall pass Ihrough an appropriatc sedimcnt rcmoval <br /> ' 13MP hcforc icaving thc constniction sitc or prior to Ucing discharged to vi infiltration facility. <br /> Thc specific 13\4Ps to bc uscd for controiling scdimcnt on this projcct incicdc: <br /> � • Gravcl I�iltcr 13cnn (f3MP C232) <br /> � • 3edimcnt 7'rap (13MP C240) <br /> • Altemativc B\1P not included in thc S11'MTiWN (2005) or S\��D4ML'\V (2004) <br /> 1 <br /> --- 6 --- <br /> , <br />