Laserfiche WebLink
' <br /> , Stormwater PolluUon Prevention P/an <br /> ' 6.0 Site Inspectians and 1Vionitoring <br /> ' Alonitoring includes visual inspection, monitoring for water quality paramctcrs of concem, and <br /> d icumentation of the inspection and monitoring findings in a site log book. A site log book �ti711 <br /> be maintained for all on-sitc construction activities and ���ill includr. <br /> ' ■ A record oCthe implemcntation of the S�VPPP and other permit <br /> rcquirements; <br /> ' ■ Sitc inspcctions: �nd, <br /> ' ■ Storm�vatcr qualih� monitoring. <br /> ' For comcnicncc, thc inspcction Comi and ��•atcr quality monitnring fonns inciudcd in this <br /> S\l'PPP include the required infomiation for thc site log book. This SVVI'PI' may function as thc <br /> sitc log book if desircd, or the fornis ma�� bc separated and includcd in a scparate site log book. <br /> ' 1 lo�vc��cr, if separatcd, thc sitc log book but must bc maintained on-siic or��•ithin rcasonablc <br /> access lo the site and hc made a�ailahle upnn requcst to Ecology or thc local iurisdiction. <br /> , 6.1 Sitc lnspection <br /> ' All F31�1Ps �tiill be inspcctcd, maintaincd, �nd repaired as necdcd to assurc continucd perforniance <br /> of thcir inicnded function. l'hc inspcctor�vill be a Ccrtiticd �rosian and Sediment Control Lead <br /> (CLSCL) per R\-iP C1G0. Thc namc and contact inComiation for thc CGSCL is providcd in <br /> , Section � of this S�\'VI'P. <br /> ' Sitc inspcclion ���ill occur in all arcas disturhed h}� construction activitics and at all stomiaatcr <br /> discharge points. Stonmvaicr�vill be exatnined Cor the prcsence oP suspended sediment, <br /> turhidity, discoloration, and oily sheen. T1ie site inspector will ecaluate and document the <br /> ' effccti��eness of the installed HMPs and determine if it is necessar}• to repair or replac� any of the <br /> 13MPs to intpro�'c thr .�ualily of stomn��atcr discharges. All main�cnancc and repairs �vil! bc <br /> documcnlcd in the sitc log book or fornis provided in this document. All nc�v BV1Ps or design <br /> ' changes ��ill be documcnted in Ihe SNPPP as soon as possihlc. <br /> ' 6.1.1 Sitc Inspcction Frcqucncy <br /> Site inspections ���II be conductcd at Ieast once a ���eek and �vithin 24 hours follo�ving any <br /> rainfall event ���hich causes a discharge of stomi���ater from the site. For sites with temporary <br /> � stabilization measures, the site inspection frequcncy can be reduced to once every m��th. <br /> 1 <br /> , 19 <br />