My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2909 SEAWAY BLVD 2018-01-01 MF Import
>
Address Records
>
SEAWAY BLVD
>
2909
>
2909 SEAWAY BLVD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 11:33:30 AM
Creation date
3/9/2017 5:12:49 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
2909
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, Stormwater Pollutic � Prevenfion Plan <br /> ' Appendit E — Sitc Inspection Forms (and Site Log) <br /> , "i'hc results of each inspection shall be summarized in an inspcetion report or chccklist <br /> ' that is entcrcd into or attached to thc sitc loe book. lt is suecested that Uic inspection <br /> report or checklist be included in this appendix to kecp monitoring ��d inspcction <br /> infomiation in onc documcnt, but this is optional. Ilo���cver, it is mandatory that this <br /> , S�'�'PPP and the site inspec:ion forms be kept onsite at all times durine construction, :uid <br /> that inspections be perlomred and documentcd as ouUincd bclm��. <br /> , .�t a minimum, cach inspection report or checklist shnll include: <br /> a. Inspcction datci[imcs <br /> , b. \Veather inforniation: general conditions durinc inspection. <br /> appr�timatc amount of precipitation sincc thc last inspcction, <br /> ' �md approxim,uc amount of prccipitation ��•ithin thc last 24 hours. <br /> c, A summary or list of all f3\1Ps that hace been implemented, <br /> including obscrvations of all crosionlscdimcnt control swctures or <br /> � practices. <br /> d. 1'he following shall be noted: <br /> ' i, locations of B�1Ps inspectcd, <br /> ii. locations of 13�1Ps that need maintenance. <br /> ' iii. thc renson maintenance is necded, <br /> ' i�•, locations of 13\4Vs that failcd to operatc as dcsigncd ur <br /> intcnded, and <br /> ��. locations whcre additional nr dilTcrent !3\1Ps are needed. and <br /> ' thc rc�son(s) wli�• <br /> c. A description of stonn���atcr disch;irged from the site. 'I'he presence <br /> ' of suspcndcd scdiment, hirbid ��:uer, discolorntion, and/or oil <br /> sheen shall be noud, as applicahlc. <br /> ' f. r\ dcscription uf any �vatcr quality monitoring perfomicd during <br /> inspcclion, and thc rcsulis of that monitoring. <br /> ' g. Gencral commcnts and notcs, inch�ding a bricf dcscription of any <br /> [3�iP r rcpairs, mnintenmicc or installations made as a result of the <br /> inspection. <br /> ' h, A statemcnt that, in thc jud�ncnt of thc person conducting thc sitc <br /> inspcetion, thc sitc is eithcr in compliancc or out of compliancc <br /> �vidi thc tcrms and conditions of thc S�VPPY and tlic NPDGS <br /> ' pemiit. If thc sitc inspection indicates that the sitc is out oC <br /> compliance, thc inspection report shall include a summap� of the <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.