My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6920 SEAWAY BLVD 2018-01-01 MF Import
>
Address Records
>
SEAWAY BLVD
>
6920
>
6920 SEAWAY BLVD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 3:25:24 PM
Creation date
3/9/2017 5:32:17 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
6920
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1015
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k ff <br /> p <br /> consuHing englneers <br /> November 8> 1979 <br /> City of Everett Engineering Dept. <br /> Everett, Washington 98201 <br /> Attention: Celia l. Strong, Public Service Engineer <br /> Subject: Fluke Manufacturin9 Company, 20th Ave. Extention Site <br /> Your W.O. 1391-1 <br /> Dear Celia: <br /> Thank you for your kind letter of Oct. 24, 1979. We have now made the <br /> changes to thc plans as requested by your office. <br /> The lake storm water storage volume was recalculated, using 1:25 year <br /> inflows and 1:10 year outflow, which raised the water level by 0.3 feet. <br /> The lake control structure details have been added to the plans & details. <br /> The Public Water System has been redrafted on a separate sheet and we now <br /> have a water system detail sheet. As of November 8, 1979, the sizes and <br /> locations of the potable water and the fire system water into the building <br /> are not determined by the mechanical engineer and are therefore not shown. <br /> The is a note that these systems details will conform to City of Everett <br /> standards- <br /> Also, the sanitary sewer trunk line is shown without connections to the <br /> building as these are not yet determined either. Again, the construction <br /> will conform to City o.' Everett standards. <br /> We are hereby submitting four sets of the revised plans and calculations <br /> for your approval and also enclosed are the plans previously submitted with <br /> your comments. <br /> If you have any questions, please call me. <br /> Very truly yours, �,..: { -- <br /> �-Ct�..: �I�..��� � _ _ <br /> Steven Mennet <br /> Civil Engineering Division �� <br /> Enclosures ,. . �; }„�1 �. _ i <br /> SM/�eb <br /> cc: Robert Terrell - The McKinley Architects <br /> Clay Bush - Fluke Manufacturing Company <br /> 700 Iloyd bldg., seattle, wa 98101 (206) 622-5822 <br /> anchorage los angeles porfland seattle <br />
The URL can be used to link to this page
Your browser does not support the video tag.