Laserfiche WebLink
� <br /> G E N E R A L C 0 N D I T I 0 N S A N D <br /> IS U P P L E M E N T A R Y C 0 N D ? T I 0 N S <br /> PAftT 1 <br /> ITHE GENERAL CONDITIONS <br /> i The General Condi[ians of [he Contract for Cons[ruction, AIA Documen[ A201, <br /> Augus[ 1976 Edition, are hereby made a par[ oE the Agreement between the Owner <br /> and the Contractor and shall have full force and affec[, excep[ as modified <br /> Iherein, as [hough bound and included in these Contzact Locumen[s. <br /> PAItT 2 <br /> IMODIFICATIONS <br /> The General Condi[ions of The Conttact for Cons[ruction cit?d above, are <br /> I modified as follovs. Where any part of the General Conditions is modified by <br /> [hese Articles, the unaltered previsions remain in effec[. <br /> ARTICLE 4 CONTRACTOR <br /> I 4.10 PROGRESS SCfiEDULE <br /> I Refer to Sec[ion 01300, Submittals, for descrip[ion of Cons[ruc[ion <br /> Schedule. <br /> 1 4.11 DOCUMENTS AND �AMPLES AT THE SITE <br /> Refet to Sec[ion 01700, Pro�ject Closeou[, for descri�tion of Yroiect <br /> 1 Record Documents. <br /> 4.12 SHOP URAWINGS, PRODUCT DATA AND £AMPLES <br /> fRefer to Section 01300, Submit[als, for descriptions of Shop Drawings, <br /> � Product and Samples submittal procedures. <br /> ! 4.14 CUTTING AND PATCHING OF WORK <br /> � <br /> Refer to Section 01010, Summary of Work, for description of ':utting and <br /> ( Sleeving for mechanical and electrical work. <br /> 4.15 CLEANING UY <br /> � Refet [o Section 01700, Pro,ject Closeout, Eor additional requirements <br /> regarding cleaning. <br /> i ARTICLE 5 SUBCONTKACTORS <br /> I5.2 AWARD OF SUBCONTItACTS AND OTHER CONTRACTS FOR PORTIONS OF THE WORK <br /> Refer to Section 01300, Submittals, for fur[her requiremen[s for Lis[ of <br /> � Subcontractors. <br /> I SC-1 <br /> 8301 <br /> �l + <br /> I <br />