My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6920 SEAWAY BLVD 2018-01-01 MF Import
>
Address Records
>
SEAWAY BLVD
>
6920
>
6920 SEAWAY BLVD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 3:25:24 PM
Creation date
3/9/2017 5:32:17 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
6920
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1015
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> � ISSUE A <br /> B. Con[rac[or's Options: 25 JUN 84 <br /> 1. For products specified only by reference standard, select any <br /> ptoduct mee[tng [hat s[andatd. <br /> � 2. For produc[s specified Sy naming several p.u�uct� or manufac[urers, <br /> select any one o: the products or manufac[urers named, vhich <br /> 1 complies with the specifica[ions. <br /> 3. Far praducts specified by naming one or more produces ot <br /> � �canufac[urets and "or equal", Contrac[or stiall submit a request as <br /> for substitutions for any ptoduct or manufac[urer. <br /> C. Substitu[ions: <br /> � 1. For a period of 3U days after Notice to Proceed; if phased <br /> cor.struction, within 30 days after date of No[ice [o Proceed for <br /> each phase; Architect will consider vritten requests from Con�ractot <br /> � for subs[i[ution of products. <br /> 2. Submit a sepazate reqlest for each product, aupported wi[h complete <br /> � data, ai[h drawings and samples as appropria[e. Requests shall <br /> reference the Section and paragraph number of the item for which it <br /> is [o be substituted. itequests shAll include: <br /> a. Comparison of the qualities of [he proposed subs[itutlon with <br /> � that specified. <br /> b. Changes tequired in other elements of the aork because of the <br /> � substitution. <br /> � <br /> c. ManuEacturet's data, speciEications, drawings, cuts, performance <br /> � data and tests, or other informa[ion neceasary to campletely <br /> describe [he i[em. <br /> � d. Effect on the construction schedule. <br /> e. Cos[ data comparing the proposed substitution with the ptoduc[ <br /> specified. <br /> , 3. Architect will be the judge of the accep[ability of the proposed <br /> substitution. <br /> � D. Contractor's Reptesentation: A request for a substitution constitutes a <br /> tepresentation [ha[ [he Contrac[or: <br /> 1. Nas investigat-d the proposed ptoduc[ and determined tha[ i[ is <br /> 1 equal to or superior !n all respects to [hat specified. <br /> 2. Will provide the same warcanties for the substitution as for [he <br /> pro�ucc specified. <br /> 3. Will coordinate [he installa[ion of an accepted substi[ution into <br /> [he work, and make such other changes as may be required to make the <br /> work comple[e in all respects. <br /> 01600-2 <br /> 8301 <br /> ' Z� <br />
The URL can be used to link to this page
Your browser does not support the video tag.