1 , <br /> � ISSUE A <br /> 25 JUN 84 <br /> B. Priur to final payment, deliver to Architect vrltten guarantees of vork <br /> � performed and material furnished for various parts of the work, called <br /> for in General Conditions and [he Specifica[ions. <br /> ( C. The guarantees shall state that the item of work will be free from <br /> � defec[ive materials and workmanship for [he number of years sta[ed in <br /> documents, and that [he Contractor vill make necessary tepairs and <br /> I replacement. <br /> D. The guarantees shall be in form satisfactory to Architect, and shall be <br /> signed by both [he Con[rac[or and appropriate subcontractor. Where <br /> � required by the Specifications, manuEacturer's guarantee shall be <br /> furnished. <br /> � 1.07 MAINTENANCE MATERIAL <br /> A. General: Provide maintenance material vhere required by Specificationa, <br /> � in quantity specified. Store where directed; obtain receip[ from Ovner <br /> + that material has been delivered. <br /> i <br /> 1.08 IDENTIFICATIUN OF MATERIALS AND EQUIPMENT <br /> IA. General: Furnish complete list of all materials, appliances, equipment <br /> and other items used in the wor4, showing name, product make, model, <br /> � name and addresa of supplier, and any o[her pertinen[ data to permi[ <br /> identifica[ion and putchase as required under the Ovner's maintenance <br /> program. <br /> 1 1.09 FINAL INSPECTION <br /> A. General: When Contractor considers the work is complete, he shall <br /> + submit written certifica[ion [hat: <br /> I 1. Contract documents have been reviewed. <br /> 2. Work has been inspected Eor compliance vi[h Contract documents. <br /> ( 3. Wotk has been completed in accurdance with Con[ract documen[s. <br /> � 4. Equipment and systems have been [es[ed in accordance with <br /> requiremen[s of Specifications, and are operational. <br /> 5. Work is completed and ready for final inspection. <br /> B. Archi[ecr will make an inspec[ion to verify the status of completion <br /> aith reasonahle ptomptness after receipt of required certifications. <br /> C. Should Architect consider tha[ [he work is incomplete or defec[ive: <br /> l. Architect will ptomptly no[ify the Con[rac[or in writing, lis[ing <br /> the incomplete or defective work. <br /> 2. Contractor shall take immediate steps to remedy the s[ated <br /> deficiencies, and send a second wri[[en certification [o [he <br /> Architect that [he work is complete. <br /> � <br /> 3. elrchi[ect wili reinsoect tlie work. <br /> 01���-3 (,��1 <br /> � 8301 ��"J <br />