Laserfiche WebLink
i <br /> IAIl exposed sTeel bolis, nuts, frarne, etc. shall be painted with coal tar <br /> coal�ng in conformonce with AWWA C204 standards. <br /> IB. All gate valves shall be installed and tested with tl�e •.vater main pipe. <br /> I 2.03 VALVE BOXES <br /> Valve boxes shall conform to Section 76-2.01 and 70-3.06 of the Standard <br /> Specificatinns. <br /> I 2.04 FIRE HYDRANTS <br /> A. Fire hydranTs shall be Corey type (opening with The pressure) conforming to <br /> ' AWWA C502-64 with o 6-inch inlet and a minim�m M.V.O. of 5-I/4 inch, <br /> ' two 2-I/2 inch hose nozzles and one 4-inch pump nozzle, with Evereit Fire <br /> Department siandard ihread, I-I/4 inch pentagon operating nut and opening <br /> i by turi,'ng counter-clockwise (lefi). Hydranis shall be consiructed with <br /> mechonicaljoint connections. <br /> I B. Fire hydranis shall be of Traffic type and pruvision shall be made for <br /> drainage of barrel to protect units from freezing. Fire hydrants shall be <br /> Pacific States Cast Iron Pipe Co. (Model 2) or approved equal. Approval of <br /> Iihe City of Everett must be obtained prior to installa4ion. <br /> C. Hydranis shall be painted "Rustoleum" /l659 yellow gloss. <br /> I D. All hydrants shall be installed with an auxiliary gate valve beiween tlie <br /> hydrant main valve and ihe water main. The gate valve shall be UL <br /> approved and tiave n two-inch square operating nut. The valve shall be <br /> i insiailed at the hydrant-lateral tee. If !he hydrant is greater than ten (10) <br /> feet from the n�ain, the gaTe valve sholl be insialled in the !nteral line, ten <br /> feet from the hydrant. The protector cover for ihe valvc shall be (e`! in <br /> Iplain view, flush with grade after landscaping or pnvinq. <br /> E. Hydranis, auxiliary gaTe valves and supply lines shall be installed to meet <br /> � sound engineering standards per NFPA 1124, paragraphs 4202, 4301, 4302, <br /> � 4303, 4304, 4"305, and shall be tested in accordance with Section 74-2.12. <br /> iPART 3- EXECUTION <br /> 3.01 INSTALLATION <br /> IAll water mains and appurter.ances shall be installed in accoroance with <br /> Sections 73 and 74 of ihe Standc.rd 5pecifications. <br /> � 3.02 TRENCH, EXCAVATION AfJD BACKFILL <br /> See Section 02221 for irench conditions. <br /> I 3.03 TESTING <br /> I <br /> ' 02713-Z <br /> I aso i 50 <br />