Laserfiche WebLink
' � <br /> � Section 61 and 62 of ihe AP�NA Standard Specifications. <br /> ( 3.02 TRENCH, EXCAVATION AND BACKFILL <br /> Trench, excavation ond backfill shall be Class B in accordance with ihe <br /> APWA Standard Specification Section 61-2.02, except ihat all excavation <br /> � shall be hauled away and disposed of and backfill shall be with Class A <br /> material. <br /> 9 3.03 BEDDING <br /> � <br /> Bedding for Sanitary Sewers shall be Class B bedding in accordance with <br /> � Section 61-3.0382 of ihe APWA Standard SpecificaTions (pea gravel). <br /> 3.04 PHASE II CONSTRUCTION <br /> � Stop and temporary plug oll service lines to ihe new building a} a point S <br /> feet from ihe foce of the building wall. Install a white painted 2x4, 4' long <br /> with 12" exposed, at each temporary plug. The 2x4 shall liave ihe work <br /> I "sewer" painted in black. <br /> • ■ • R k <br /> � <br /> 1 <br /> � <br /> I <br /> I <br /> i <br /> � <br /> I <br /> { <br /> ( <br /> J <br /> i <br /> 02�22_2 <br /> I 8301 � <br /> S <br />