My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6920 SEAWAY BLVD 2018-01-01 MF Import
>
Address Records
>
SEAWAY BLVD
>
6920
>
6920 SEAWAY BLVD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 3:25:24 PM
Creation date
3/9/2017 5:32:17 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
6920
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1015
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> SECPION 16010 <br /> � CENERAL PROVISIONS <br /> i "'he Contractor is required to familiarize himself xith the detailed <br /> requirements of these standards and eny local codes and ordir.ances as <br /> they affect the installation of specific electrical systems. <br /> I1 •05 PERMITS AND FEES <br /> The Contractor shall obtain and pay for all licenses, permits and <br /> I inspections required by laws, ordinances and ntles governing xork <br /> specified herein. The Contractor shall arrange for inspection of <br /> xork by the inspectors and shall give the inspectors all necessary <br /> assistance in their work of inspection. <br /> I 1 .06 COORDINATION <br /> The Contractor responsible for accomplishing Division 16 work shall <br /> / coordinate his rrork xith that of the other Contractors and/or other <br /> � trades doing xork on the pro�ect and shall ezamine all draxings and <br /> specificationa of other trades including the mechanical , <br /> � civil, architecturel, and structural fnr construction details and <br /> necessary coordination. <br /> The Contractor xill not be paid for relocution of vork, cutting, <br /> � patching and finishing required for work that is re-installed due to <br /> � lack of coordination prior to installation. <br /> I 1 .07 CONTRACT DRAWINGS <br /> A. Racexays, boxes and ground connections are shoxn diagrammaticnlly <br /> only and indicate the general character and approximate location. <br /> fB. The draxings do not show all requirements of the specifications. The <br /> dravings and specificationa arn complimentary and what is called for <br /> � (or shoxn) in either is required to be provided as if called for in <br /> both. <br /> C. Any miror changes (leas th�n 5�-0") in the location of the raceway9, <br /> � outlets, boxes, etc. , from those shown on the draxings shall be made <br /> vithout eztra charge, xhere coordination requires or if so directed <br /> by the Architect before rough-in. <br /> ' <br /> 1 .08 ITEMIZED SCHEDULE OF COSTS <br /> Furnish a contract cost breakdown by specification section to the <br /> Architect vich a copy to the Engineer to allow evaluation of partial <br /> � payment requests. Refer to the Supplementary Conditions of Generel <br /> Contract for details, and conform thereto. <br /> 1 .09 WARRANmY <br /> The Contractor shall guarantee all xork installed under this <br /> specification. He shall make good, repair or replace, at hia own <br /> expense, any defective xork, materials or parts xhich may show <br /> themselves within one year after final ecceptance, if in the opinion <br /> of the Architect said defect is dtte to imperfection in material, <br /> design or xorlananship. <br /> 16010-2 <br /> i 83-Ot <br /> 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.