My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6920 SEAWAY BLVD 2018-01-01 MF Import
>
Address Records
>
SEAWAY BLVD
>
6920
>
6920 SEAWAY BLVD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 3:25:24 PM
Creation date
3/9/2017 5:32:17 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
6920
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1015
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> I � ' <br /> c� <br /> •; : ��L�L��IJ �J <br /> CONSTRUCTION CO., INC <br /> - P.O. BOX C'190'2 <br /> � 22B 9Lh I�VE,N., SEATTLE.WA.9f3'IOB <br /> [2061 662-7770 <br /> July 26, 1979 <br /> City of Everett <br /> Everett Building Department <br /> City Hall <br /> Everett, Washington 96401 <br /> Attention Mr. Ken Callahan <br /> RE: JOHN FLU1� MFG. CO. - EVGRF.TT CI�MPUS <br /> Gentlemen: <br /> j As discussed in our meeting Wednesday afternoon, July 25, 1979 , it is extremely <br /> important that the building site preparation be completed during the summer months. <br /> �� Unless it is completed before the fall ratns the construction of the building may be <br /> � seriously delayed. We aapreciate very much the consideration given to this pro- <br /> blem by you and the other representatives of the Building and Ena'.neering Depart- <br /> ments in our meetings yesterday. <br /> In accordance with your advice to us, the City of �verett will issue a building <br />, permit for the construction upon completion and submittal of the butlding design <br /> drawings. However, these dra�vings will not be avallable before early September, <br /> a date too late to optimistically expect to do the e:ccavation work befor� fail. It <br /> is our unc�erstanding that no separate permit is required for clearing and eX rovaliof <br /> worl:, but an approval should be secured. We, therefore, request your app <br /> our commencing the following work at the earltest possible ciate. <br /> 1 . Clear building area and the staging area at the north end of the building. <br /> 2, Excacate and fill build{ng site only. <br /> 3. Remove peat from southerly swam� area and replace with c.ompacted fill <br /> from building excavation for future constructton. <br /> p � (L. <br />
The URL can be used to link to this page
Your browser does not support the video tag.