My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6920 SEAWAY BLVD 2018-01-01 MF Import
>
Address Records
>
SEAWAY BLVD
>
6920
>
6920 SEAWAY BLVD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 3:25:24 PM
Creation date
3/9/2017 5:32:17 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
6920
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1015
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.03 FILL <br /> A. General: Preparation for fill: Remove debris and decayable matter from <br /> areas to be filled. <br /> B. Siructural Fill: <br /> I. General: All fills shown, other than on drawing 1.1.4, "Excess Maferial <br /> Mounding Plan," shall be placed as siructural fill. <br /> 2. Preparation: After completion of site clearing, the area to be filled <br /> shall be proof•-rolled under ihe direction of ihe Special Inspector to <br /> locate soft areas and to prepare the base for the structural fill. AIl <br /> soft areas shall be overexcavated fo suitable ground and all fills <br /> benched into }he exisTing ground. <br /> 3. Placement: Place in loose lifts not exceeding 10 inches in ihickness. <br /> Thoroughly compoct to criteria fisTed in the following table: <br /> Ftecommended Compaction Criteria for Structural Fill <br /> Proiect Area *Minimum Percent Compaction <br /> Beneath f3uilding Area 95 <br /> Roadway and Parking Areas <br /> Within 2 feet of subgrade 95 <br /> surface <br /> Lower portions of fill 92 <br /> Pond Embankments 9Z <br /> Pond "B" Liner 95 <br /> "PercenT of maximum dry density determined in accordance with <br /> ASTM D-1557. <br /> 4. Material: On-site excavated material shall be used for siructural fill <br /> only if it can be placed and compacted when its moisture content is <br /> within 2% of optimum. The Special Inspector shail be notified if <br /> conditions do not permit placing and compaction with the moisture <br /> content in the plus/minus 2% range. <br /> All siructural fill material should be free of debris, organic contam- <br /> inanis and rock fragments larger than 6 inches. Particle sizes larger <br /> than 3 inches should be excluded from ihe top foot of fill. <br /> 5. The pond "B" liner material shall be constructed of weathered or <br /> unweathered till from ihe site. This material shall be compacted os <br /> 02200-3 <br /> 8301 �q' <br /> /71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.