Laserfiche WebLink
B. The Coniractor shall ins ect ihe existin ha boles around ihe 18-inch storm <br /> oipe under eowa�vd. aporoximately b0 feet �orth of Station I +65 ast <br /> Koa� FY+ � n bales ihat o ear clo ed b sediment or that hove <br /> "fallen aport" shall be replaced. he existina and new bales shall be firmly <br /> anchored in lace and buttea to ether to conirol silis and revent b assin <br /> 0 ows aroun t e a es. is tem orar s stem s a be remove w en <br /> site ara ina on ydroseedinq os been comp eted <br /> 3.02 Areas To Bc Cleared: As shown and noted on ihe construction lans var in <br /> de rees of clearin and rubbin wil occur in di erent areas. he <br /> o�iractor sha be held re onsi e or ihe activities o is wor men and <br /> ihe protection o irees to remai� is paramount <br /> A. Completed Cieorinq and Grubbinq• In ihe buildinq orea and mass oradina <br /> areas, ail oraanic material sholl be rer-ioved <br /> B. Excess Moterial Moundin Areas: In these areas all irees fla ed b the <br /> e��n; ector shall be rotected. he remainin trees and brush shall be <br /> cut to within 2 inches o the qround surface and removPd prior to plocina o <br /> any material. o qrubbmq will be required <br /> C. Undisturbec: Areas: Keep all consiruction equipment and moterials from <br /> tnese areas Do not disturb in any woy withoui ihe written permis�ion of <br /> ihe pecial nspector. <br /> 3.03 CLEARING: Clearing shall consist of ihe felling, irimming, and cutfing of <br /> irees into sections, and the sati:Factory disposal of ihe irees and oTher <br /> vegetation designated for removcl, including downed timber, snags, brush, <br /> ond rubbish occurring within ihe areas to be cleared. Cut off flush with or <br /> below ihe original ground surface irees, siumps, roots, brush, and other <br /> vegetotion in areas to b� cleared, except for irees and vegetation indicated <br /> or directed to be left standing. <br /> 3.04 GRUBBING: Grubbing shall consist of ihe removal and disposal of roots <br /> larger ihan 3 inches in diameter, matied roots and stumps from ihe <br /> indicated grubbing areos. Excavate ihis material, together with logs, <br /> organic and metollic debris, brush and refuse, and remove to a depih of not <br /> less ihan 6 inches below ihe original soil surface in areas indicated to be <br /> grubbed and in areas indicated as consiruction areas under this coniract. <br /> 3.05 DISPOSAL OF CLEARED AND GRUBBFD MATERIALS: <br /> />. Remove from the project and disp� . of off-site. On-site buming only with <br /> approvol of Owner ond local fire F ���t,+ction permii and air pollut�on conirol <br /> permit. — <br /> * ' * END OF SECTION +� * w <br /> 02100-2 y <br /> 8301 <br />