Laserfiche WebLink
appearance and be ploced to minimize erosian of the backfill material. The <br /> larger rocks shall be placed at ihe base of the rockery so ihat the wall will <br /> be stable and have a stable appearonce. The rocks shall be placed in a <br /> manner such that the longitudinal oxis of the rock shall be at right angles or <br /> perpendic�lar to ihe rockery face. The rocks shall have all inclinino faces <br /> sloFing to ihe back of the rockery. Each course of rocks shall be seated as <br /> tightly and evenly as possible on 4he course benrath. After setting eo <br /> course of rock, ali voids between ihe rocks shall be chinked o� ihe back wi � <br /> smoller rocks or quarry spalls to eliminate any void sufficient to pass a �- <br /> in�h square probe. <br /> E. The wall backfill shal� consist of �arry spall materiol. This material shall <br /> be placed to a iwelve (!2) inch minimum ihickness between the entire wall <br /> and the cut or fill material. The backfill material shall be placed in lifis to <br /> un elevation approximately six (6) inches below the top of each course of <br /> rocks as ihey are placed, until ihe uppermost course is placed. Any u�orry <br /> s all material on the bearing surface of one rock course shall be removed <br /> before setting the next course. <br /> F. The perforated ADS drain pipe shall discharge at the low point of ihe toe of <br /> ihe rxkery or ihrougli the face of the curb neorest ihe rockery. <br /> + . . t x <br /> 02276-2 IL <br /> 8301 <br />