Laserfiche WebLink
, • , <br /> SECTION 02722 ISSUE B <br /> SANITARY SEWERAGE SYSTEM I7 JULY 84 <br /> DRT 3 <br /> FARTI - GENERAL <br /> I.01 DESCRIPTION <br /> A. Related Work Specified Elsewhere: <br /> I. Trenching, Backfilling and Compaction, Section 02221 <br /> 2. Earihwork, Section 02200. <br /> B. Description Of Work: The extent of ihe sanitary sewerage system is shown <br /> on ihe plans and consists of an on-site collection system which connecis to <br /> an existing sewer sewer line stub outside ihe 201h Avenue West paved areo, <br /> at the new entrance road. <br /> 1.02 QUALITY ASSURANCE <br /> A. Standard Specifications: The "Cit of Everett Desi n and Construction <br /> Standards and Specifications," dated pri , 1984, shall apply unless <br /> modified herein. <br /> PART 2 - MATERIALS <br /> 2.01 SEWER PIPE <br /> Sewer pipe shall be PVC conforming to ASTM D 3034-80, SDR 35. Rubber <br /> gaskets for pipe shall meet ASTM C443 standards. � <br /> 2.02 MANHOLES <br /> A. Manholes shall be 48 inch diameter, shall be precast concrete or cast-in- <br /> place concrete, wiTh steel reinforcement; steps will be pinced at one-foot <br /> spacing, conforming to currenT safety regulations per $tandard Drawing No. <br /> 605. <br /> B. The manhole frame and caver shall be 24-inch diameter cast iron <br /> conforming with STandard Drawing No. 607. <br /> PART 3 - EXECUTION <br /> 3.01 INSTALLATION <br /> All sanitary sewers and manholes shall be installed in accordance with <br /> Section 6 of ihe Siandard Specifications. <br /> 02722-I Z�( <br /> 8301 <br />