My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7007 SEAWAY BLVD 2018-01-02 MF Import
>
Address Records
>
SEAWAY BLVD
>
7007
>
7007 SEAWAY BLVD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 3:45:16 PM
Creation date
3/9/2017 5:39:11 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7007
Notes
NARBECK WETLANDS SANCTUARY
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Watershed Company <br /> Memorandum <br /> To Client, Team Members and Involved Regulatory Officials: <br /> Lennie Rae Cooke and Bill Lewallen, Snohomish County Airport <br /> Clay Bush, Fluke Corporation <br /> Daryl Bertholet and Jay McGill, Ciry of Everett Parks and Recreation <br /> Gary Doughty, Everett Planning Department � <br /> Kirk Brooks, Wayne Wentz and Jane Zimmerman, City of Everett Public Works ' <br /> John Barker and John Galloway, Galloway Barker Architects <br /> David Hamlin, David I. Hamlin dc Assodates <br /> Bob Montgomery, Montgomery Water Group, Inc. <br /> From: Bill Way and Kathy Smith, The Watershed Company <br /> Date: November 8, 1996 <br /> Re: Nazbeck Swamp Interpretive Pazk, Nov. 1, 1996 Pre-App. Design Meeting Notes <br /> On Friday, Nov. 1, 1996, the above listed individuals attended a pre-application <br /> meeting for the Narbeck Swamp Interpretive Park project. A number of issues were <br /> discussed and are summarized in the following meeHng notes. <br /> Fntranrr Rnad i <br /> • The sidewalk at the entrance needs to be located westward of where it is shown. <br /> • The sight distance mncern on the south side could be resolved by moving the <br /> trail doser to the road, thereby forcing tree planring away from road. <br /> • There needs to be a left hand tum lane and a through lane to the e�dsHng Fluke <br /> site. <br /> • Clay Bush, of F1uke, noted that the road i.aeds to be built out to the north property <br /> line. Pubiic Works indicated that jersey barriers would need to be put up if this was <br /> done. <br /> • David Hamlin stated that a signal pole needs to be added on the F1uke site. <br /> H„� Pi+ll Ont <br /> • The school bus pull out needs to be moved further south, if possible. <br /> • The transit pull out is O.K. as is. <br /> Par i� i.nt & C;reen Hnuce Rnad Matarials <br /> • The parking lot layout is O.K. as is. <br /> • Public Works voiced concern over maintaining painted lines for the parking <br /> stalls on a crushed material surface. <br /> • The Parks Dept. voiced concern over future maintenance of a cr,shed material <br /> 1 <br /> 1410 Market Strcet • EO.6oz 1180 • Kirklani •WA 98033-0918 •Phone(206)822-5242• Fax(206)827-8136 �3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.