Laserfiche WebLink
everett INSPECTION REPORT <br /> � Address �� ✓�� <br /> Contractor f��F �`�Q� <br /> Owner y � <br /> Date � �� <br /> TYPE OF INSPECTION REQUESTED <br /> �BLDG: Pmt. No.��� 1 MECH: Pmt. No. <br /> O ELEC: PmL No. "-: PLBG: Pmt. No. — <br /> ❑Temp. Elect. ❑ Framing ❑Gas Piping <br /> � Footing G Drywall, Nailing G Consultation <br /> Foundalion ❑ Shear Nailing ❑ Groundwork <br /> ❑ Ductwork ❑ Grid ❑ Struct.Slab <br /> ❑Wood Stove ❑ Rough-In ❑ Final <br /> ❑ Masonry O Service ❑ <br /> � APPROVAL ❑ PARTIAL APPROVAL <br /> VIOLATION ❑ CORRECTION REQUIRED <br /> Ci Correclions listed beluw MUST BE MADG be(ore work can be approved. <br /> ❑ Please contact inspector and arrange lor appointment. <br /> ❑ Was nol able to pertorm inspection. - <br /> ❑ CALL 259•8810 FOR REINSPECTION — 24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPAN <br /> d� <br /> L�L. <br /> Gar-7X• �'rf�+ �-c� <br /> Inspector Date � <br />