Laserfiche WebLink
SOILS OB�ERVATION REPORT • CONTINUATION <br /> PROJECT:Bddwin Residence Wall JOB�f: OF-5233 <br /> CLIENT: lam Baldwin REPpRT#:S07 <br /> DATE: 10-9-2008 <br /> PAGE#: 2 of 2 <br /> AddiNonal Commenb: Due to the difficu��.ies observed in maiMaining an optimum moisture content in the <br /> backfill associated v•ith lhe lower wall,we recommend the contractor switch to using crushed rock as backfill <br /> behind the upper ret�ining wall.We aiso recommend that the contractor attempt ro dry surfical bacKfill behind the <br /> lower retaining wall by covering during heavy rain and minimizing wnstruction foot traffic over areas ezhibiting <br /> slight pumping. <br /> ,tion between the upper and lower wall fronts was measured to be appror.imately 14 teel.We recommend a <br /> �n of 10 teet separation be maintained. <br /> I <br /> .o ..�-n�.w,n..�a.��n.+-,i.�n...:..n.u........rv.Y�.n-n„nm.-�+.�e,,..�.T�isrepons�eil�qlDereprW�ceEe�ce%�nful�wrl ��GTS�hMBpMOvllplGpOTBS�$Prvitt6.l�t ' ' ' <br /> The a�ove�esl�esvils reia�c only�o�!�e sa-�p�e(a�owt�on�ixs�e�CuppnB i ,� � <br /> / : <br />