Laserfiche WebLink
PUBLIC WORKS PERMIT CaMMENTS <br /> 4. Connect side sewer per Cily Standard#601. <br /> 5. Connect side sewer per City Slandard#'s 601, 602, 604. <br /> 6. Connect all roo(top downspouls to lhe side sewer. <br /> 7. Connect roo(top downspouts to lhe drainage syslem provided for lhis lol. <br /> 8. Rooftop runoff must be discharged to a roof downspoul infiltralion system per City of Everell Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25'long. See altachment for <br /> more delails. <br /> � The conlracicr musl mee[with lhe Public Works Inspecior lo discuss polenliai drainage routing prior lo <br /> beginning Ihe project. <br /> 10J Install erosion controi measures as determined by Ihe Public Works inspeclor, such as sill fence, siraw <br /> bales, swates,or erosion blankets. <br /> 11. Install erosion conlrol measures per City of Everelt Slandards for small parcels <br /> / i1'1. Remove erosion conlrol measures upon completion of the projecl prior to final approval of lhe permit. <br /> L� <br /> 13. All excavated material from foundalion, sidewalk and driveways shall be hauled to an approved, <br /> permitted sile. No wasling of malerial is allowed on this building lot. <br /> 14. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15. No building maleriais to be slacked on sidewalks and sidewalks to be kepl clean and open for <br /> pedestrian travel. <br /> 1 G. Adjust water meter box t"above sidewalk grade. <br /> 17. Remove and replace curb, c�uller and sidewalk as per City of Everelt Slandard Plan!�'s 305A& 306 on <br /> lhis proposal's frontage as direcled by the Public Works Inspeclor (i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Instatl a Type I concrele driveway per City of Everell Standard#307. <br /> 19. Pave driveway from lhe fronl property line out lo the streel paving. <br /> 20. Conlacl the Waler DisUict for connecling provisions for this building's waler and <br /> sewer services. <br /> 21. A catch basin as per Cily Standard P�an#402 wilh a gas Uap per Standard Pian#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is lo be inslalled, Ihe pressure line must discharge inlo a private manhole, lhen <br /> gravity flo�v across lhe public righl-of-way. <br /> 23. A sprinkler system is required for lhis building in compliance wilh lhe requiremenls of NFDA Slandards <br /> 13D. <br /> Pt'JGomments <br />