My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
511 WAVERLY AVE 2016-01-01 MF Import
>
Address Records
>
WAVERLY AVE
>
511
>
511 WAVERLY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 8:25:02 AM
Creation date
3/9/2017 8:24:57 AM
Metadata
Fields
Template:
Address Document
Street Name
WAVERLY AVE
Street Number
511
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> cr.ossu c�[ woxx oxn�s t�aPoxm � <br /> Total Utility Maintenance Management System <br /> 04/29/1996 Page 1 <br /> ----------------------------------------------------------------------------- <br /> Date Range :O1/09/1989 - 04/11/1996 <br /> C1�: Work Order Range :1001091070001 - IIT1002- - Pattern :7101196750670 <br /> Item Ranqe :<glank> - WW22020001 Pattern :* <br /> Pra3ram 11LL Function �I,L Activity ALL <br /> =-_�__�_________________________________=___________________________-=__=__ <br /> CN WORK ORDER ID: 7101196750670 Title: CONVERT 511 WAVERLY f�'� <br /> «DUPLIC.�.TE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS0895U010 -- W?,TER SERVICE <br /> Location ID: -- <br /> Program 710 Function 119 Activity 675 <br /> Date Completed: �'14/10/1996 <br /> Overall Craft: <br /> issued: 04/OS/1996 issued by: WMW l,ssiqned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Lebor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> UL SSJ SMITH, STEVE J. 0.00 4.00 59.64 <br /> WST WDT WALDEN, DAROLD T. 0.00 4.U0 79.68 <br /> � Total Labor Cost: 139.32 <br /> !(ateriais: <br /> ID Description Date �C Used Cc�t <br /> ------------ ------------------------------ -------- -------- ---------- <br /> BOX000056247 BOX METER PLA 15" X 10^ W/LID 04/09/1996 1 12.96 <br /> CQUP34101847 COUPLING 3/4" THREADED BRASS ^ 04/09/1996 2 2.12 <br /> COUP34142747 COUPLING 3/4" CTS COMP X MIPT@ 04/09/1996 1 4.15 <br /> METE36089447 METER 5/8^ X 3/4" NEPTUNE T-10 04/09/1996 1 30.68 <br /> NIPP34131847 NIPPLE 3/4" X 3" BRASS ^ 04/09/1996 1 1.29 <br /> NIPP34131947 NIPPLE 3/�4" X 4" BRASS ^ 04/09/1996 1 1.73 <br /> SETT34146547 SETTER COP 5/8" X 3/4" (H9") 04/09/1996 1 42.05 <br /> Total Material Cost: �94 98 <br /> Vehicles: <br /> \�-- <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V2117 91 CHEV 1-TON HYD UNIT 4.00 22.40 <br /> Total Vehicle Cost: 22.40 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> METER,� 41508184 <br /> Total cost for work order 710119675C670: 256.70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.